Please retain product label and instructions for future reference
12
Step 16 (
internal
)
Fix the casement stay to the
window using 20mm screws
as shown in the ilustration.
once in position secure the
pins to the roof framing with
20mm screws, ensuring the
stay and pins align and lock
the window -
See greenhouse
nail bag.
See greenhouse instructions
for screw quantities.
Pre drill
hole
20mm
screw
11
Step 17 (
internal
)
Place the greenhouse roof frame(
s
)
(
No. 11
-
See front page
) against each
window panel and secure in place
using 3x50mm screws per frame,
ensuring to screw into each panel.
6x50mm Screws
Pre drill
hole
50mm
screw
Step 18 (
internal
)
Using the roof’s as a guide, mark the
position for the roof block (
No. 12
) at
the top of the
shed door gable
.
Once marked secure the block to the
gable using 1x70mm screw, making
sure to secure through the block into
the central upright on the door gable.
1x70mm Screws
Pre drill
hole
70mm
screw