Step 3
Place the plain gable (
No.3
)
and one of the plain panels
(
No.2
) on to the floor and fix
the corners together using
3x50mm screws.
Do not secure the building to
the floor until the roof is
secured in place.
*Ensure the plain gable is fitted on
the inside of the plain panel. Screw
through the plain gable framing
into the framing of the plain panel.
3x50mm screws
Pre drill
hole
50mm
screw
Pre drill
hole
50mm
screw
2
3
1
2
Step 2
Place the floor (
No. 4
) onto a
firm and level surface.
Ensure your base has suitable
drainage and is free from
areas where standing water
can collect.
a
b
a
a
b
b
b
b
b
b
Step 4
Following the same method
outlined in
Step 3
place the
second plain panel and
assembled door gable onto
the floor and fix at each corner
using 50mm screws.
Do not secure the building to
the floor until the roof is
secured in place.
9x50mm screws
a
b
b
b
b
b
a
a
a
a
a
a
a
a
a
Step 5
Fix the 2x “L” brackets (
No. 13
) to
either end of the ridge bar (
No. 7
)
using 2x20mm screws per bracket.
*Ensure the bracket plate(
s
) are
flush with each end of the ridge
bar.
Once in place position the ridge bar
between the gables, securing into
position using 2x30mm screws per
side.
4x20mm Screws