Important!
3. Clamp one end of the first
jumper cable to the positive ( + )
terminal of the discharged
battery and the other end to the
positive ( + ) terminal of the
charged battery. Make sure the
cable clamps do not touch any
other metal parts.
4. Clamp one end of the second
jumper cable to the grounded
negative (-) terminal of the
charged battery and the final
connection to a grounded
heavy metal bracket in the
engine compartment or on the
engine of the disabled vehicle
(in case the disabled vehicle is
a 400 E or 500 E, make the
final connection to the negative
(-) terminal of the discharged
battery). Make sure the cables
are not on or near pulleys, fans,
or other parts that will move
when the engine is started.
5. Start engine of the vehicle with
the charged battery and run at
high idle. Then start engine of
the disabled vehicle in the
usual manner.
6. After the engine has started,
remove jum per cables by
exactly reversing the above
installation sequence, starting
with the last connection made
first. When removing each
clamp, make sure that it does
not touch any other metal while
the other end is still attached.
Important!
A discharged battery can freeze at
approx. + 14°F (- 10°C). In that
case it must be thawed out before
jum per cables are used.
Jumper cables specifications:
• Minimum cable cross-section of
25 mm2 or approx. 2 AWG
• Maximum length of 11.5 ft
(3.5 m).
Warning!
Never lean over batteries while
connecting or jump starting,
you might get injured.
Battery fluid contains sulfuric
acid. Do not allow this fluid to
come in contact with eyes,
skin, or clothing. In case it
does, immediately flush
affected area with water,
and seek medical help.
A battery will also produce
hydrogen gas, which is
flammable and explosive.
Keep flames or sparks away
from battery, avoid improper
connection of jumper cables,
smoking etc..
97
Pr
a
c
ti
c
a
l
H
in
ts
Содержание E 500
Страница 1: ...Owner s Manual ...
Страница 3: ...Mercedes Benz Owner s Manual 300 E 2 8 300 E 300 CE 300 E 4MATIC 400 E 500 E ...
Страница 13: ...11 Instruments and Controls ...
Страница 22: ......
Страница 108: ......
Страница 131: ...Index ...
Страница 136: ...NOTES 134 ...
Страница 137: ...NOTES ...
Страница 140: ...Mercedes Benz AG Stuttgart Untertuerkheim ...