![MENZL 330-076 Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/menzl/330-076/330-076_operators-manual_1771242012.webp)
Multitest ND
Operator's manual
-
12
-
Lung-governed demand valve
—opening pressure
IMPORTANT: Be sure to strictly adhere to the sequence of steps!
Detach the lung-governed demand valve from the equipment
connector.
Attach the connecting nipple of the lung-governed demand valve to the
SCBA.
Open the breathing-air-cylinder valves.
Attach the lung-governed demand valve to the equipment
connector.
Move the “suction pump” lever to the “OPEN” position.
Press the pump push-button.
Perform the test against the specifications provided by the equipment
manufacturer.
Mask
—leak tightness
Strap the mask onto the dummy head.
Connect the testing hose to the tester and the mask.
Move
the “suction pump” lever to the “OPEN” position.
Press and hold the pump push-button.
Let the pressure build up until it is slightly higher than the level required
for testing and move the “suction pump” lever to the “CLOSED” position.
Release the pump push-button.
Release pressure via the relief valve until the level required for testing is
reached.
Perform the test against the specifications provided by the equipment
manufacturer.