MEMOLUB
®
HPS
2-Point MEMOLUB
®
System
SPLTIN-0103-PG3 Copyright © 2003 PLI, LLC All Rights Reserved
2-Point MEMOLUB
®
System
With Splitter-MEMO
Output Programming
Lubricant Output Programming
Timing Rings are placed in the Black Ring Holder individually or in combination. This programs the number of
ejected cycles that occur each day and thus the daily lubricant output.
Each output strokes ejects .635 cc's of lubricant. This lubricant is divided between the two output ports.
The Stroke Limiting Washers used with the Single Point MEMOLUB
®
to adjust the Volume of output per stroke
are NOT used with the MEMOLUB
®
HPS 2-Point Splitter System.
The frequency of cartridge change-out is shown under each HPS model.
HPS Standard, Model 120
Days to
Empty
Weeks to
Empty
Months
to Empty
1
-
16
2
-
47
7
1
94
13
3
126
18
4
189
27
6
378
54
13
8
HPS Mega, Model 240
Days to
Empty
Weeks to
Empty
Months
to Empty
2
-
31
4
1
94
13
3
189
27
6
253
36
8
375
54
13
750
107
25
16
HPS Giga, Model 480
Days to
Empty
Weeks to
Empty
Months
to Empty
4
1
63
9
2
189
27
6
378
54
13
505
72
17
750
107
25
-
-
-
31
Program
Ejection
Cycles
Per Day
Daily
Output
in CC's***
24
15.24
12
7.62
RB
4
2.54
R
2
1.27
BW
1.5*
0.95
W
1
0.64
B
.5**
0.32
RW
RWB
If, at the ejection rate selected, the "Months to Empty" exceed 12 months, it is recommended that the Lubricant
Cartridge and Battery Pack be replaced at least every 12 months.
To extend Battery Pack and Lubricant Cartridge change-out to 24 months, we suggest the use of "Cold Weather"
Lithium Battery Packs.
* Ejection cycle occurs every 16 hours. Daily Output shown is average lubricant output per day.
** Ejection cycle occurs every other day. Daily Output shown is average lubricant output per day.
R = Red Timing Ring
B = Black Timing Ring
W = White Timing Ring
MEMOLUB
®
HPS User's Guide
Page 29 of 39
PLI, LLC
*** Each bearing on the 2-point system will receive approximately half this volume of lubricant daily.