![MEMMINGER-IRO MSF 3 Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/memminger-iro/msf-3/msf-3_instruction-manual_1769296006.webp)
4
Installation
Connecting the contact cable
►
Fix the contact cable (4) with cable ties (5) to the
feeder support ring (3) (3 to 10 mm thick, 25 to 30
mm wide).
The red wire (6) of the contact cable must be at the top.
The text (2) on the contact cable must be visible.
The contact cable must be positioned 3 mm below the
top edge of the feeder ring.
►
Switch on the power supply. Use a voltmeter to check
that the contact cable has been installed correctly.
For standard units, the voltage measured between the red
and blue wires must be 57 V DC ±10% when the knitting
machine is switched on. For reduced powered units the
voltage tested should be 35 V DC ±10%.
►
Ensure that the polarity is correct.
►
Insulate the ends of the cables using MEMMINGER-
IRO GMBH insulating caps 000-721-116 (1).
Voltage 57 V DC
Bus A
Bus B
0 V DC
red
black
brown
blue
MEMMINGER-IRO GMBH
3 mm
Fitting the flat ring holder
► Screw the flat ring holder (7) to the unit.
►
Switch off the power supply.
► Fit the unit to the flat ring (3).
The contact cable (4) must be located in the guide (9).
This is the only way of ensuring that the contact pins
(8) effectively make contact with the wire in the contact
cable.
NOTE!
Do not crush the contact cable during this
operation.