Starting up

Mains supply

The mains cable must be arranged so that it can not come anywhere into contact with hot surfaces of the unit.

Filling the waterbath

In  order  to  protect  the  stainless  steel  shaking 
device  it  is  necessary  to  use  deionised  water  as 
the  thermofluid.  The  bath  must  be  filled  so  that 
the liquid level is between the two level marks on 
the right inside the tank (with the shaking device 
carrying its load)!

Note!
Depending on the loading of the shaking device and the shaking speed selected, it is possible 
for  the  bath  liquid  or  the  (possibly  noxious)  shaken  liquid  to  slop  over.  In  that  case  the 
shaking speed or the liquid level have to be suitably adjusted but without going below the 
minimum liquid level.

Switching on and setting the shaking speed

The unit is switched on by pressing the push/turn control. The 

 symbol indicates that the unit is ready 

for operation.

Quick stop on overload

The unit incorporates a quick stop on overload as a safety device.
Operation of this safety device can be recognised by the symbol 

 lighting up.

In this case it is necessary to check whether there is any overloading or whether some object has been 
trapped in the system.
After the overload has been removed, the shaking device can be restarted by briefly pressing the SET key 
and setting the shaking speed again.

Fault: 

overload/

blockage

SET key

Shaking device 
ready for operation

Shaking 
speed

Max. level

Min. level

35
50

145
160

120
130

90

105

65
80

Bar dark approx.:

Bar bright approx.:

Unit is switched on.

Unit is switched off.

After the shaking device has been switched on, the setpoint for 
the shaking speed is always set to 0 strokes per minute.
The shaking speed is selected by rotating the push/turn control 
while holding down the SET key.

strokes per minute

push/turn 
control