Operating and installation instructions
M-WRG-II P-T (-F, -FC), M-WRG-II E-T (-F, -FC) ventilation units
- 7 -
Meltem Wärmerückgewinnung GmbH & Co. KG
Am Hartholz 4 · D-82239 Alling
[email protected] · www.meltem.com
VENTILATION THE RIGHT WAY
V E N T I L A T I O N & H E A T R E C O V E R Y
1.2.2 Three-step rotary switch with zero position
The ventilation unit can be operated via a three-step rotary switch with zero position
(provided by the customer). A suitable example is available from BUSCH-JAEGER or
GIRA.
The three-step rotary switch is used to select one of three different ventilation programs.
In the zero position, the ventilation unit is in standby mode.
1.2.3 Optional pushbutton for intensive ventilation
In addition to the three-step rotary switch, an optional pushbutton may be installed for
activating 15 minutes of intensive ventilation at maximum power level.
1.2.4 Optional accessories
Part no. Type
Description
5478-10 M-WRG-FBH
The wireless remote control is used to control, program and
extend the range of functions of all M-WRG-II units. It can
also be used to read the number of operating hours.
5478-20 M-WRG-FT
The 4-way wireless pushbutton switch with LED feedback
allows the M-WRG-II units to be operated wirelessly.
5478-11 M-WRG-ALGH The mobile reader is used to read the number of hours for
which the M-WRG-II units have been in use.
Table 1: Optional accessories
1.3
Target group
These operating and installation instructions are aimed at two target groups:
— Chapters “1 Introduction” to “14 Troubleshooting” are intended for users of the ventila-
tion unit. No special prior knowledge is needed.
— The activities described in chapters “15 Installing the InControl pushbutton sensor”
and “16 Installing the three-step rotary switch with zero position” must only be carried
out by technicians with the following qualifications:
— Training in the installation and commissioning of electrical devices
— Training in electrical hazards and the local safety requirements
— Knowledge of the relevant standards and directives
— Knowledge and observance of this document and all the safety instructions
1.4
EU declaration of conformity
The ventilation units from the M-WRG-II P and M-WRG-II E series manufactured by
Meltem Wärmerückgewinnung GmbH & Co. KG
Am Hartholz 4
82239 Alling
conform to the regulations and standards listed in the EU Declaration of Conformity
provided.