background image

www.mellanox.com

324-Port InfiniBand FDR SwitchX®

Switch Platform Hardware Installation Guide

PN:SX6518-NR, SX6518-6R

 

Rev 1.

3

Содержание SX6518

Страница 1: ...www mellanox com 324 Port InfiniBand FDR SwitchX Switch Platform Hardware Installation Guide PN SX6518 NR SX6518 6R Rev 1 3...

Страница 2: ...Document Number 3805 Mellanox Technologies 2...

Страница 3: ...ections 39 1 8 1 Powering Up the Switch Platform 39 1 9 InfiniBand QSFP Cable Installation 41 1 9 1 Supported Approved Cables 42 1 9 2 Cable Power Classes 42 1 10 Hot Swap Insertion and Extraction 42...

Страница 4: ...ply Unit 80 6 2 Leaf Board 80 6 3 Management Module 81 6 4 Spine Board 82 6 5 MLNX OS Software 82 Chapter 7 Disassembly and Disposal 84 7 1 Disassembling the Chassis 84 7 1 1 Removing the Chassis 84 7...

Страница 5: ...us 63 Table 9 Bad Port LED Configurations 63 Table 10 LEDs Display for Normal Operation 64 Table 11 LEDs Display for Normal Operation 65 Table 12 Management Module PSU LED Configurations 65 Table 13 M...

Страница 6: ...al Lift 29 Figure 15 Place the Upper Bracket Offset 29 Figure 16 Attach the Shelf Extension 30 Figure 17 Caged Nut Placement by U Numbers 31 Figure 18 Location for the Lock Down Bar 31 Figure 19 Fork...

Страница 7: ...Module 55 Figure 52 Intact vs Defected Signal Connectors 56 Figure 53 Intact vs Defected Power Pin Holders 56 Figure 54 Power Supply Unit Status Indications 58 Figure 55 PSU Cover On and Off 59 Figure...

Страница 8: ...Added Figure 60 Management Module LEDs on page 65 Updated Section 1 4 Power Supply Redundancy on page 15 Section 1 7 3 5 Installing the Shelf on page 23 Section 1 7 4 Installing the Cable Holder on p...

Страница 9: ...Architecture Specification that is provided by IBTA Switch Product Release Notes For possible hardware issues see the switch support product page This requires a customer support login Look up the re...

Страница 10: ...Mellanox Technologies SX System Type SwitchX Switch PR Data Transfer Protocol 1 2 3 4 Ethernet 5 6 7 8 InfiniBand G Module Generation 5 6 7 8 FF Number of leafs 36 18 12 06 C Data Rate B 40Gb s Ethern...

Страница 11: ...to make the initial configuration 1 1 Installation Safety Warnings These safety warnings are in English For French German Spanish Russian and Roma nian see the Appendixes 1 Installation Instructions...

Страница 12: ...h an ambient temperature exceed ing the maximum recommended 45 C 113 F Moreover to guarantee proper air flow allow at least 8cm 3 inches of clearance around the ventilation openings The chassis should...

Страница 13: ...warnings instructions When this product is mounted or serviced in a rack special precautions must be taken to ensure that the system remains stable In general you should fill the rack with equip ment...

Страница 14: ...terminal screws of this device must be connected to the protective earth in the building installation GND Connection Information The building installation shall provide a means for a connection to pro...

Страница 15: ...mechanical and fire enclosure shall be provided by the end prod uct manufacturer and or the end user Caution Slide rail mounted equipment is not to be used as a shelf or a work space The rails are no...

Страница 16: ...occurred during shipping It is highly recommended that the installation sites be as isolated as possible from all sources of radio transmissions and electrical interference It is highly recommended t...

Страница 17: ...ht of the switch is supported from underneath the unit by the shelf This chassis can be installed in standard 19 racks that have between 65cm and 80cm between the vertical supports of the rack Make su...

Страница 18: ...dure on the SX6518 switch system 1 Put an ESD prevention wrist strap on your wrist and make sure there is good contact between your body and the strap 2 Plug the other end of the wrist strap to a vali...

Страница 19: ...ses It is recommended to have at least two people for the duration of the installation proce dure Use a mechanical lift to raise this chassis If not use enough manpower to ensure the safety and wellbe...

Страница 20: ...et nut driver 10mm 1 socket wrench 1 socket nut driver 14mm 2 extensions for the socket driver 1 box wrench 2 flat washers for the shelf extension 6 two hole lock washers for lock down bars Bottom fil...

Страница 21: ...ve not tripped If one or more are red notify the shipper and Mellanox This on its own does not indicate damage to the con tents But be sure to carefully inspect the contents if any of the shock and ti...

Страница 22: ...unscrewing the phillips head screws hold ing the sides on 3 Remove and put aside the box 4 Visually inspect the chassis make sure that there is no visible damage 6 PSUs are installed for the chassis...

Страница 23: ...lock down bars at this time The chassis is on ball bearings and can roll easily Be aware that the chassis can roll off of the pallet Should the chassis start to fall move out of the way The chassis ca...

Страница 24: ...ould plan to keep the spine side as close to the rack door as possible thus having more room for the cables 4 Measure the distance between the vertical supports and adjust the shelf brackets according...

Страница 25: ...lace the shelf bracket so that it measures slightly more than the measured distance between the vertical rack supports Make These two brackets will need to be adjusted They may even need to be removed...

Страница 26: ...n the bracket so that it can move to the vertical support Do not tighten the hex head bolts Figure 9 Placing the Shelf Bracket Figure 10 Caged Nut Locations for the Shelf Brackets You may need to remo...

Страница 27: ...panel 9 Put the Shelf into the rack and twist the shelf into place Make sure the spine side of the shelf is closest to the rack doors See Figure 11 to identify the spine side of the shelf 10 Install a...

Страница 28: ...up the vertical rack support There are 4 holes on each side 1 7 3 6 Inserting the Chassis 1 Put the container on the fork lift Figure 13 Putting the Chassis in the Rack Using a Fork Lift The chassis i...

Страница 29: ...r Manual Mellanox Technologies 29 Figure 14 Putting the Chassis in the Rack Using a Mechanical Lift Figure 15 Place the Upper Bracket Offset 2 Screw on the two Upper Bracket offsets onto the chassis u...

Страница 30: ...using two bolts with flat washers 4 If you are installing the cable management system place 10 caged nuts on the other side of the rack in the vertical supports 5 Place caged nuts in all of the locati...

Страница 31: ...8 9 0 1 2 3 4 5 6 7 8 9 0 1 1 1 1 1 1 1 1 1 1 2 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 1 1 1 1 1 1 1 1 1 2 60 cm 21 21 Spine side Faceplate caged nuts go on this side These are for the cable holde...

Страница 32: ...ve the shelf in the rack 9 Raise the hinged extension on the container floor 10 Lower the chassis until the hinged extension is sitting on the shelf extension 11 Push the chassis from the container to...

Страница 33: ...chassis 13 Confirm that the caged nuts for the faceplate are in the correct location 14 Slide the chassis out just far enough to install the upper brackets See Figure 22 Figure 22 Upper Bracket Insta...

Страница 34: ...shelf until the face plate of the chassis touches the vertical rack support 17 Make sure the upper brackets are installed in their correct location 18 Screw the 8 bolts through the faceplate into the...

Страница 35: ...Bars Bolt and Washer Order 22 Remove the shelf extension and save for removal of the chassis 23 Connect a valid ground See Section 1 7 5 Ground Connections on page 38 for detailed instructions 24 Tig...

Страница 36: ...x Technologies 36 Figure 28 Spine Side with Filler Panels 29 Go to Chapter 3 Chassis Power Up on page 69 to power up the switch system 30 Insert 2 caged nuts for the filler panel Filler panel 5 18 8 7...

Страница 37: ...the connector side of the chassis and iden tify the holes where the caged nuts were placed in step 4 Now is the time to install the cable holder The cable holders should go to the outside of the verti...

Страница 38: ...ufficient capacity to safely convey a potential discharge The grounding post is M 6 with 1mm pitch threads A ground wire of AWG 6 or 4mm diam eter is recommended for grounding this device The chassis...

Страница 39: ...se of separate main and backup AC feeds The input voltage is Autorange 100 240 VAC 50Hz or 60Hz The output voltage for the PSUs is 48V The power cords should be stan dard 3 wire AC power cords includi...

Страница 40: ...Plug the other end of the power cords into grounded outlets Figure 31 Multiple Power Inlets Electric Caution Notification 3 Check the Status LEDs on all of the management modules and confirm that all...

Страница 41: ...o the port receptacle until the connector is firmly seated The orange LED indicator above the port will light when the physical connection is established when both ends of the cable are properly conne...

Страница 42: ...on your wrist and connect to the SX6518 chassis This switch platform supports hot swap capabilities for the parts listed below Power supply units Leaf boards Spine boards Leaf fan module Spine fan mod...

Страница 43: ...N 1600W power supplies installed the system is in N N redundant configuration half of the PSUs may be extracted without bringing down the system To extract a PSU 1 Determine which AC connector on the...

Страница 44: ...d Numbering 1 10 2 1 Extracting a Leaf Board Each leaf board has a ejector handle that locks the board in place and serves as a lever for seating or extracting see Figure 36 The green indicators shoul...

Страница 45: ...37 Leaf Release 1 10 2 2 Inserting a Leaf Board To insert the leaf board 1 Check for foreign objects in or mechanical damage to the chassis leaf slots 2 Check leaf mechanics for any noticeable damage...

Страница 46: ...s Defected Signal Connectors 4 Check power connector s integrity Look for any damage on the power connector casing or blades damage or any deviations from the pass criterion show in Figure 39 Figure 3...

Страница 47: ...n two management boards are installed and working Do not apply excessive force to slide in the leaf board If you feel resistance remove the leaf board and double check both the chassis and leaf for an...

Страница 48: ...nor the GUI management tools will allow you to shut down spine 1 or spine 2 as the management modules are connected to the chassis components through these spines Removing spine 1 causes management m...

Страница 49: ...ule For example to shut down spine 06 run the command below 2 Push outward on the ejector handles to unlock the ejectors from the chassis 3 Open the ejectors until they are at a 45 degree angle from t...

Страница 50: ...igure 42 Intact vs Defected Mechanics 3 Check back signal connectors integrity Look for any broken signal dividers or any deviations from the pass criteria shown in Figure 43 and Figure 44 Figure 43 I...

Страница 51: ...heck power connector s integrity Look for any damage on the power connector casing or blades damage or any deviations from the pass criterion shown in Figure 45 Figure 45 Intact vs Defected Power Pin...

Страница 52: ...individual fans Should a sin gle fan fail the Fan Status LED on the spine and the S Fan LED on the management module will light indicating the necessity to replace the fan module Air flow through the...

Страница 53: ...chassis will line up with the connector in the fan module When hot swapping any of the units it is necessary to wait 1 minute after removing the defective part before inserting the new part This is ne...

Страница 54: ...h buttons together while pulling the fan module out Inserting the Spine Fan Module 1 Make sure the fan module is oriented correctly top side up Confirm that the location of the connector in the chassi...

Страница 55: ...ors from the chassis 4 Open the ejectors until they are 45 degrees from the module 5 Pull out the module half way through the guiding rails using the ejector handle 6 Lock the ejector handle 7 Hold th...

Страница 56: ...power connector s integrity Look for any damage on the power connector casing or blades damage or any deviations from the pass criterion shown in Figure 53 Figure 53 Intact vs Defected Power Pin Holde...

Страница 57: ...apply excessive force to slide in the management board If you feel resistance remove the management and double check both the chassis and management for any damage On switch systems with dual manageme...

Страница 58: ...it has the following indicator LEDs Figure 54 Power Supply Unit Status Indications AC When lit this LED indicates input voltage between 100 and 240 Volts DC FAIL When lit this LED indicates a fault in...

Страница 59: ...Board Led Indicators 2 1 2 1 Status LED Each leaf board has a Status LED on the far left of the leaf Table 3 shows the leaf status according to the LED condition S1 S2 S3 S4 S5 S6 S7 S8 S9 SX6518 UID...

Страница 60: ...tact Mellanox Technologies support 2 1 2 4 Leaf Board Port Connector LED Assignment Above the ports are two LEDs one for the upper port and one for the lower port Each port has a single 2 color LED Ta...

Страница 61: ...individual spine The 36 LEDs on each spine are divided by the number of leafs and the result N is the number of connections from each leaf that are connected to the spine 9 spines must be installed an...

Страница 62: ...shing Green Spine is powering up Solid Orange Non fatal error this spine needs troubleshooting but does not require chassis shutdown Solid Red Fatal error Table 7 Spine Fan Status LED LED Color LED De...

Страница 63: ...onnector This LED lights up when one or more ports is receiving a symbol error The LED imme diately goes off until the next symbol error is received 2 1 3 5 UID LED Switch Identifier The UID LED is a...

Страница 64: ...operational Red PS fault detected User should check individual power supplies for fault indications Green SPINE FANS STATUS Off No power to fan Green Nominal operational Red One or more of the spine f...

Страница 65: ...PS fault detected User should check individual power supplies for fault indications Green SPINE FANS STATUS Off No power to fan Green Nominal operational Red One or more of the spine fans is bad User...

Страница 66: ...ed from the top row See Figure 62 Figure 61 Port Numbering Figure 62 Top and Bottom Ports Table 13 Management Module S Fan LED Configurations LED Condition Description Green OK All Spine fans are work...

Страница 67: ...X6518 They are 1 I2C port 1 CONSOLE port this is an RS232 connector for connecting to a host machine 1 MGT this is an Ethernet connector 1 USB port 1 RST reset button Figure 63 Management Module Inter...

Страница 68: ...other management module becomes the master If there is only one management module in the chassis all of the leafs and ports are reset by bringing them down and powering them up when the reset button...

Страница 69: ...full com plement of PSUs N N allows the chassis to run on 3 PSUs supplied from one power grid while 3 are connected to a second power grid 1 Check all FRUs for proper insertion and seating before con...

Страница 70: ...icates power supplies are good 3 Spine Board indicators will display status of internal links to the installed leaf boards All PHY links to existing leaf Boards should be ON 4 Check the Spine LEDs and...

Страница 71: ...xamples Figure 67 Console Ports for SX60xx SX65xx Managed Systems On SX65xx systems when having dual management systems first connect the cable and configure the master card and only then configure th...

Страница 72: ...esetting the switch to the factory defaults Type y and then press Enter Step1 Hostname switch 1 If you wish to accept the default hostname then press Enter Otherwise type a different hostname and pres...

Страница 73: ...se DHCP on mgmt0 interface yes 3 Enable IPv6 yes 4 Enable IPv6 autoconfig SLAAC on mgmt0 interface yes 5 Admin password Enter to leave unchanged CHANGED To change an answer enter the step number to re...

Страница 74: ...Enable IPv6 autoconfig SLAAC on mgmt0 interface no no Step 9 Admin password Enter to leave unchanged You have entered the following information 1 Hostname switch 112126 2 Use DHCP on mgmt0 interface...

Страница 75: ...name Step 9 Enable IPv6 yes yes Step 10 Enable IPv6 autoconfig SLAAC on mgmt0 interface no no Step 11 Admin password Enter to leave unchanged You have entered the following information 1 Hostname swi...

Страница 76: ...tch default username is admin password admin Step 4 Read and accept the EULA when prompted switch show interfaces mgmt0 Interface mgmt0 state Admin up yes Link up yes IP address 169 254 15 134 Netmask...

Страница 77: ...Internet Explorer 7 0 Chrome or Mozilla Firefox 3 0 Note Make sure the screen resolution is set to 1024x768 or higher Step 3 Type in the IP address of the switch or its DNS name in the format http sw...

Страница 78: ...hnologies 78 Step 5 Read and accept the EULA if prompted You are only prompted if you have not accessed the switch via CLI before Figure 69 EULA Prompt After login a default status summary window is d...

Страница 79: ...e this management module is reset becoming the slave and the other management module becomes the mas ter If there is only one management module in the chassis when the reset button is pushed all of th...

Страница 80: ...DC OK 2 Uninstall and reinstall the Leaf board 3 When the Yellow LED is on this indicates a fault in the board uninstall and reinstall the Leaf board 4 If uninstalling and reinstalling the Leaf board...

Страница 81: ...Issue 2 Yellow LED for the Leaf Fan on the Management Module is Lit 1 Check the MLNX OS management for confirmation and possible explanation of the alert 2 Make sure that there is nothing blocking th...

Страница 82: ...irmation and possible explanation of the alert 2 Make sure that there is nothing blocking the front or rear of the chassis and that the fan modules and ventilation holes are not blocked especially dus...

Страница 83: ...MHz Security Kasumi support Bootstrap Option H Boot ROM Location I2C Addr 0x52 Internal PCI arbiter disabled 32 kB I Cache 32 kB D Cache Board Mellanox PPC460EX Board FDEF No I2C ready DRAM 2 GB ECC...

Страница 84: ...eces in a legal and environmentally friendly way 7 1 1 Removing the Chassis 1 Remove the screws connecting the upper brackets to the rack 2 Remove the screws holding the chassis to the rack These scre...

Страница 85: ...onmental way 11 Go to the Mellanox website for detailed instructions for disassembly of the chassis according to the WEEE Directive 7 1 2 Removing the Bottom Shelf 1 Remove all of the bolts that are h...

Страница 86: ...equipment is very heavy and should be moved using a mechanical lift to avoid injuries This unit is intended for installation in a Restricted Access Location Risk of Electric Shock With the fan module...

Страница 87: ...duct or touching any internal parts Risk of electric shock and energy hazard The PSUs are all independent Disconnect all power supplies to ensure a powered down state inside of the switch platform Dur...

Страница 88: ...ical Code and the Canadian Electrical Code Warning Replace only with UL Recognized battery certified for maximum abnormal charging current not less than 4mA There is a risk of explosion should the bat...

Страница 89: ...ommunication centre or a dedicated computer room This device must be installed according to the latest version of the country national electrical codes For North America equipment must be installed in...

Страница 90: ...all waste electrical and electronic equipment EEE should be collected separately and not disposed of with regular household waste Dispose of this product and all of its parts in a responsible and env...

Страница 91: ...InfiniBand Switch Platform Hardware User Manual Mellanox Technologies 91 5 6 7 8 9 10 11 45 C 113 F 8 3 PSU...

Страница 92: ...InfiniBand Switch Platform Hardware User Manual Mellanox Technologies 92 12 InfiniBand 13 14 15 16 17 18 InfiniBand UL 4mA...

Страница 93: ...User Manual Mellanox Technologies 93 19 UL CSA 20 21 GND 22 23 24 25 UL CSA 16 AWG 125 V 13 A 1 5 4 5 HAR 1 0 300 V PVC 250 V 10 A GND RS232 UL DP 1 DP 2 LPS 20 A CLASS 1 IEC 60 825 1 1993 A1 1997 A2...

Страница 94: ...InfiniBand Switch Platform Hardware User Manual Mellanox Technologies 94 26 27 WEEE 28 WEEE 2002 96 EC EEE TN IT...

Страница 95: ...nual Mellanox Technologies 95 29 China CCC Warning Statement A 3 Avertissements de s curit pour l installation French 1 Instructions d installation Veuillez lire la totalit des instructions d installa...

Страница 96: ...odule de ventilation est retir les broches d alimentation sont expos es dans l emplacement du module NE PAS ins rer d outils ou la main dans l emplacement du module Cet quipement ne doit pas tre en se...

Страница 97: ...ors tension d branchez toutes les alimen tations Pendant un orage ne pas travailler sur l quipement ni brancher ou d brancher des c bles Les c bles InfiniBand en cuivre sont lourds et peu flexibles Pa...

Страница 98: ...16 AWG avec une prise moul e 125 V 13 A faisant au moins 1 5 m de long six pieds et au plus 4 5 m Pour le branchement lectrique en Europe utiliser un cordon d alimentation au format international harm...

Страница 99: ...Attention l utilisation de commandes l ajustement ou la conduite de proc dures autres que celles indiqu es ici pourraient conduire une exposition dangereuse des rayonnements Pour les produits disposa...

Страница 100: ...erletzungen zu vermeiden Diese Ger t ist f r die Installation in einem Bereich mit beschr nktem Zugang vorge sehen Stromschlagrisiko Bei abgenommenem Ventilatormodul sind die Stromkontakte in der Modu...

Страница 101: ...teile Risiko eines Stromschlags und Stomgefahr Alle Stromversorgungseinheiten sind unabh ngig Trennen Sie alle Stomversorgungen um einen abgeschalteten Zustand im Inneren der Switch Plattform sicherzu...

Страница 102: ...L anerkannten Akkus ersetzen die f r maximalen anor malen Ladestrom von nicht weniger als 4mA zertifiziert sind Es besteht Explosiionsgefahr wenn der Akku durch einen Akku eines falschen Typs ersetzt...

Страница 103: ...de Verkabelung Achtung Nutzung von Steuerungen oder Einstellungen oder Ausf hrung von Proze duren die hier nicht spezifiziert sind kann zu gef hrlichem Strahlenkontakt f hren Klasse 1 Laserprodukt und...

Страница 104: ...over nicamente mediante un elevador mec nico para evitar lesiones Esta unidad ha sido ideada para instalar en lugares de acceso restringido Riesgo de descarga el ctrica Con el m dulo del ventilador qu...

Страница 105: ...l neutro Quitar los cables de corriente antes de abrir la tapa de este producto o tocar cualquier componente interno Riesgo de descarga el ctrica y peligro de corriente Todas las fuentes de alimentaci...

Страница 106: ...ciones vigentes del C digo El ctrico Nacional de los EE UU y del C digo El ctrico de Canad II y a danger d explosion s il y a remplacement incorrect de la batterie Remplacer uniquement avec une batter...

Страница 107: ...ificio El equipo se instalar en un rea donde haya conexi n equipotencial como por ejemplo un centro de telecomunicaciones o una sala de computadoras dedicada Este dispositivo se debe instalar conforme...

Страница 108: ...a unidad hacia afuera del bastidor Sirven solo para la instalaci n permanente en el lugar de destino final no para fines de servicio o mantenimiento Conforme a la Directiva 2002 96 CE sobre RAEE todos...

Страница 109: ...InfiniBand Switch Platform Hardware User Manual Mellanox Technologies 109 4 5 6 7 8 9 10 45 C 113 F 8 3...

Страница 110: ...InfiniBand Switch Platform Hardware User Manual Mellanox Technologies 110 11 12 InfiniBand 13 14 15 16 17 InfiniBand...

Страница 111: ...InfiniBand Switch Platform Hardware User Manual Mellanox Technologies 111 18 19 UL CSA 20 21 22 UL 4 UL CSA 3 16 AWG 1 5 6 4 5 125 13 HAR 3 1 0 300 250 10...

Страница 112: ...24 25 26 27 WEEE A 7 Avertismente privind siguran a la instalare Romanian 1 Instruc iuni de instalare RS232 Ethernet DP 1 DP 2 UL 20 1 IEC 60 825 1 1993 A1 1997 A2 2001 EN 60825 1 1994 A1 1996 A2 2001...

Страница 113: ...ndep rtat pinii electrici sunt accesibili n cavitatea modulului NU introduce i instrumente sau p r i din corp n cavitatea modulului ventilator Acest echipament nu trebuie s fie ac ionat ntr o zon und...

Страница 114: ...ele de alimentare cu energie pentru a asigura decuplarea n inte riorul platformei de comutare n timpul perioadelor cu desc rc ri electrice luminoase nu lucra i cu echipamentul sau nu conecta i sau dec...

Страница 115: ...4 5 m Pentru conectarea la o surs de alimentare n Europa selecta i un cordon de alimentare care este armonizat la nivel interna ional i marcat HAR cu 3 conductoare cu minimum 2 fire de 1 0 mm cu pute...

Страница 116: ...20 A trebuie s fie integrat n cablajul cl dirii Aten ie Utilizarea elementelor de comand sau ajustarea sau executarea altor proce duri dec t a celor indicate n acest document poate avea ca rezultat e...

Страница 117: ...je vrlo te ka i treba se premje tati pomo u mehani kog dizala kako bi se izbjegle ozljede Ovaj ure aj je namijenjen za instaliranje na lokaciju s ograni enim pristupom Rizik od strujnog udara S uklon...

Страница 118: ...li ako nije dobro pri vr en Ovaj sustav raspola e dvopolnim neutralnim osigura ima Uklonite sve kabele napa janja prije otvaranja poklopca proizvoda ili dodirivanja unutarnjih dijelova Rizik od strujn...

Страница 119: ...ma navedenim u US National Electrical Code i Canadian Electrical Code Upozorenje Bateriju zamijenite samo baterijom iz serije UL koja je certifici rana za maksimalnu nepravilnu struju punjenja ne manj...

Страница 120: ...ure aj mora instalirati sukladno najnovijoj verziji nacionalnih elektri nih kodova dr ave U Sjevernoj Americi oprema se mora instalirati sukladno va e im zahtjevima navedenim u US National Electrical...

Страница 121: ...002 96 EZ sav elektri ni i elektroni ki otpad EEE trebao bi se prikupljati zasebno i ne bi se trebao odlagati kao obi an ku anski otpad Odlaganje ovog proizvoda i svih njegovih dijelova vr ite na odgo...

Страница 122: ...mail info mellanox com Map and Directions Tech Support 408 916 0055 8 00AM to 5 00 PM Pacfic Mellanox Technologies Ltd Beit Mellanox PO Box 586 Yokneam 20692 Israel Tel 972 0 4 909 7200 972 0 74 723 7...

Страница 123: ...InfiniBand Switch Platform Hardware User Manual Mellanox Technologies 123 324 Port InfiniBand FDR Switch Platform Installation Guide...

Отзывы: