Installation
47
Mellanox Technologies
Figure 29: Mechanical Lift
Step 18.
Position the chassis in front of the installation rack (
).
Step 19.
Unscrew both lock-down bars.
Step 20.
Using a fork or mechanical lift, position the middle of the leaf-side of the chassis in front of
the spine-side of the rack (
Figure 30: Rack and Chassis Alignment
The chassis is on ball bearings and can roll easily. Beware that the chassis can roll off
of the pallet possibly causing grave bodily harm should it fall on someone.
Содержание Switch-IB
Страница 2: ...Doc MLNX 15 4748 324 2 Mellanox Technologies...
Страница 103: ...104 Mellanox Technologies Figure 77 InfiniBand QSFP Connector Symbol...
Страница 104: ...105 Mellanox Technologies Figure 78 QSFP Connector Male and Female Views...
Страница 111: ...112 Mellanox Technologies 6 7 8 9 10 11...
Страница 112: ...113 Mellanox Technologies 12 13 14 15 16 17...
Страница 113: ...114 Mellanox Technologies 18 19 20 21 WEEE 22 H 4 Chinese 1...
Страница 114: ...115 Mellanox Technologies 2 3 4 5 6 7 8 r r 368...
Страница 115: ...116 Mellanox Technologies 9 10 InfiniBand 11 12 13 14 15 UL CSA 16 QILQL DQG 8 6 9 5 9 39 9...
Страница 116: ...117 Mellanox Technologies 17 18 19 20 WEEE 21 56 8 3 3 36 71 7...
Страница 127: ...128 Mellanox Technologies 3 4 5 6 7 8 9 45 C 113 F 8 3...
Страница 144: ...145 Mellanox Technologies 5 6 7 8 9 10 11 FP 368...
Страница 146: ...147 Mellanox Technologies 19 20 21 2 2 71 7...