background image

M2401G 24 Port 20Gb/s InfiniBand Switch for the Dell M1000e Chassis User Manual

Mellanox Technologies 

Rev 1.0

15

4

Troubleshooting

As soon as a switch is plugged in make sure that the power LED is on.

The power LED for the switch does not come on:

If the green Power LED is not on; 

1. Check that the chassis has power. 

2. Remove and reinstall the switch. 

The link LED for the InfiniBand connector does not come on:

1. Check that both ends of the cable are connected.

2. Check that the locks on the ends are secured.

3. Make sure that the latest FW version is installed on both the HCA and the switch.

4. If media adapters are used check that the all connections are good, tight, and secure.

The activity LED does not come on:

Check that the Subnet Manager has been started.

The power LED for the switch shuts off:

1. Check that the there is adequate ventilation. 

2. Make sure that there is nothing blocking the front or rear of the chassis and that the fan modules 

are not blocked.

Содержание M2401G

Страница 1: ...Mellanox Technologies M2401G 24 Port 20Gb s InfiniBand Switch for the Dell M1000e Chassis User Manual Rev 1 0...

Страница 2: ...909 7200 Fax 972 4 959 3245 NOTE THIS INFORMATION IS PROVIDED BY MELLANOX FOR INFORMATIONAL PURPOSES ONLY AND ANY EXPRESS OR IMPLIED WARRANTIES INCLUDING BUT NOT LIMITED TO THE IMPLIED WARRANTIES OF...

Страница 3: ...2 2 2 Mechanical Installation 11 2 2 2 1 Removing an Old Switch From the Chassis 12 2 2 2 2 Removing a Blank Cover Plate From the Chassis 12 2 2 2 3 Installing the Mellanox M2401G Switch Into the Dell...

Страница 4: ...ttp support dell com Conventions Throughout this manual the name M2401G and the term switch are used to describe the 24 port 20Gb s InfiniBand switch for the Dell M1000e unless explicitly indicated ot...

Страница 5: ...User Manual MellanoxTechnologies Rev 1 0 5 This product does not require Advanced Management Table 2 Switch Products Covered in this User s Manual Product Number Description M2401G 24 Port 20 Gb s unm...

Страница 6: ...Rev 1 0 MellanoxTechnologies 6 Revision History Table 3 Revision History Table Date Revision Description June 2008 Rev 1 0 First Draft...

Страница 7: ...m comes pre installed with all necessary firmware and configured for standard operation with InfiniBand fabric and requires an InfiniBand compliant Subnet Manager running from one of the hosts All tha...

Страница 8: ...running and a valid physical connection between nodes exists The yellow LED when lit indicates a valid data activity link this is the logical link The yellow LED illuminates when the InfiniBand netwo...

Страница 9: ...te Source LED Blue Amber Green OFF N A OFF OFF OFF BOOT_IN_PROGRESS IOM OFF OFF ON NORMAL STACK_MASTER IOM ON OFF ON STACK_SLAVE Stackable IOM OFF OFF ON IOM_FAULT self diagnosed IOM OFF BLINK 1HZ ON...

Страница 10: ...ty Warnings 1 Installation Instructions Read all installation instructions before connecting the equipment to the power source 2 Over temperature This equipment should not be operated in an area with...

Страница 11: ...he top 7 Equipment Installation This equipment should be installed replaced or serviced only by trained and quali fied personnel 8 Equipment Disposal Disposal of this equipment should be in accordance...

Страница 12: ...nk cover plate by pushing the red latch release button 3 Pull the locking arm down to a position perpendicular to the front of the chassis 4 Pull the cover plate out of the chassis using the locking a...

Страница 13: ...ctioning port plugged into the other end of the connector After plugging in a cable lock the connector using the latching mechanism particular to the cable vendor The YELLOW LED will light non blinkin...

Страница 14: ...available Mellanox will notify customers and the new firmware image will be found on the Mellanox firmware download page You will need the Mellanox Firmware Tools package to update firmware for this s...

Страница 15: ...connector does not come on 1 Check that both ends of the cable are connected 2 Check that the locks on the ends are secured 3 Make sure that the latest FW version is installed on both the HCA and the...

Страница 16: ...hock Vibration 50W M2401G 0 to 50 Celsius 10 90 non condensing Protocol Support Regulatory Compliance InfiniBand QoS Management Auto Negotiation of 10Gb s or 20Gb s 8 InfiniBand Virtual Lanes for all...

Страница 17: ...M2401G 24 Port 20Gb s InfiniBand Switch for the Dell M1000e Chassis User Manual MellanoxTechnologies Rev 1 0 17 Appendix B Mechanical Drawing Figure 4 Mechanical Drawing of the Switch...

Страница 18: ...commercial environment This equip ment generates uses and can radiate radio frequency energy and if not installed and used in accor dance with the instruction manual may cause harmful interference to...

Страница 19: ...ments Japan Class A Statement Translation This is a Class A product based on the standard of the Voluntary Control Council for Interference by Information Technology Equipment VCCI If this equipment i...

Страница 20: ...G6 G7 G8 G9 GND GND GND GND GND GND Sense 3 3V Vcc GND S1 S2 S3 S4 S5 S6 S7 S8 S9 S11 S12 S13 S14 S15 S16 S10 H1 H2 GND GND Table 6 Connector Pin Name and Numbe Name Correspondence Connector Pin Numb...

Страница 21: ...M2401G 24 Port 20Gb s InfiniBand Switch for the Dell M1000e Chassis User Manual MellanoxTechnologies Rev 1 0 21 Appendix E Local Authorization Form...

Страница 22: ...Rev 1 0 MellanoxTechnologies 22...

Отзывы: