Rev 2.0.0
Mellanox Technologies
14
Parts included in the installation kit:
Figure 7: Rack Installation Kit Parts
Before you install your new MTS3600 switch, unpack the system and check to make sure that all the parts
have been sent, check this against the parts list. Check the parts for visible damages that may have occurred
during shipping.
Note: If anything is damaged or missing, contact your customer representative immediately.
Procedure
1.
Place the ESD mat on the floor where you will be working and put on the ESD strap. Make sure the
ESD strap is touching your skin and that the other end is connected to a verified ground.
2.
Choose which side of the switch you want even with the vertical rack support. Either the side
with the power supply units or the side with the IB connectors can be even with the vertical
rack support. The other side of the switch will be further inside of the rack.
Things to consider before choosing where to mount the rails and rail slides.
• 2 rails
• 8 recessed flat head screws
• 2 rail slides
• 4 caged nuts
• 8 pan head screws M6
• 2 metal washers
rail
rail slide