M3601Q 16+16 Port 40Gb/s InfiniBand Switch User Manual

Mellanox Technologies 

Rev 1.1

12

2.2.2

Removing an I/O Module Blank From the Chassis

1. Unlock the I/O Module Blank by pushing the red latch release button. 

2. Pull the locking arm down to a position perpendicular to the front of the chassis.

3. Pull the I/O Module Blank out of the chassis using the locking arm.

4. Install either a new switch or reinstall a blank IOM within one minute.

2.2.3

Installing the Mellanox M3601Q Switch Into the Dell Chassis

Note: Make sure the rack is stable on a solid floor and that the rack is filled from the bottom up. 
This will keep the center of gravity as low as possible reducing risk of tipping.

Note: The M3601Q I/O module occupies both Fabric B and Fabric C slots and connects to the 
Fabric C mid-plane. The ConnectX I/O card must be installed in the Fabric C location on the 
server blade to support data flow. You must install a module in slots B1/C1 before installing a 
module in slots B2/C2.

Refer to the Dell PowerEdge M1000e Hardware Owners Manual for more information.

1. Follow the instructions in Section 2.2.1 or Section 2.2.2 to remove an old switch or an I/O Mod-

ule Blank.

2. On the new switch, push the red latch release button. 

3. Pull the lever forward until the lever is perpendicular to the front panel.

4. Push the switch into the slot until the latching mechanism is against the bar. 

5. Push the lever on the latching mechanism up, making sure that the latching mechanism catches 

the locking bar. The lever should now be parallel to the front panel. 

6. Check the indicator lights to make sure the switch has power.

The rack mounting is designed to fit the PowerEdge M1000e Chassis. Take precau-
tions to guarantee proper ventilation for air intake at the front of the chassis and 
exhaust at the rear in order to maintain good airflow at ambient temperature. Cable 
routing in particular should not impede the air exhaust from the chassis.

2.3

Power Connections and Initial Power On

Caution: The I/O module will automatically power up when AC power is applied. There is no 
power switch. Immediately upon closing the latching mechanism check to make sure that the 
green switch LED is lit.

2.4

InfiniBand Cable Installation

All cables can be inserted or removed with the unit power on. To insert a cable, press the connector 
into the port receptacle until the connector is firmly seated. The green LED indicator accompanying 
each port will light when the physical connection is established (that is, when the unit is powered 
on and a cable is plugged into the port with a functioning port plugged into the other end of the con-
nector). After plugging in a cable, lock the connector using the latching mechanism particular to the 
cable vendor. The yellow LED will light if the subnet manager is running (non blinking indicating 
that no data is being transferred yet). When a logical connection is made the yellow LED will blink 
signifying data is being transferred. 

Содержание InfiniScale IV M3601Q

Страница 1: ...anox Technologies Third party information brought to you courtesy of Dell InfiniScale IV 16 16 Port 40Gb s InfiniBand Switch for Dell PowerEdge M1000e series Blade Enclosures User Manual PN M3601Q Rev...

Страница 2: ...U S A www Mellanox com Tel 408 970 3400 Fax 408 970 3403 Mellanox Technologies Ltd PO Box 586 Hermon Building Yokneam 20692 Israel Tel 972 4 909 7200 Fax 972 4 959 3245 NOTE THIS INFORMATION IS PROVID...

Страница 3: ...Module Blank From the Chassis 12 2 2 3 Installing the Mellanox M3601Q Switch Into the Dell Chassis 12 2 3 Power Connections and Initial Power On 12 2 4 InfiniBand Cable Installation 12 Chapter 3 Clust...

Страница 4: ...ces Mellanox Technologies Web pages http www mellanox com Dell Support Web pages http support dell com Conventions Throughout this manual the name M3601Q and the terms switch I O module and IOM are us...

Страница 5: ...Port 40Gb s InfiniBand Switch User Manual MellanoxTechnologies Rev 1 1 5 Revision History Table 2 Revision History Table Date Revision Description March 2009 1 1 Added Dell Logo November 2008 1 0 Ini...

Страница 6: ...comes pre installed with all necessary firmware and configured for standard oper ation within an InfiniBand fabric and requires an InfiniBand compliant Subnet Manager running from one of the hosts Al...

Страница 7: ...a valid physical connection to the other system switch or HCA port exists The yel low LED when lit indicates that the Subnet Manager is running and a valid data link exists The yellow LED illuminates...

Страница 8: ...G BLUE The CMC is identifying the newly installed switch ON ON BLUE Switch is on and operating Normally ON ON or BLINKING AMBER Fault in System Self diagnosed OFF ON or BLINKING AMBER Fault in System...

Страница 9: ...fore carrying on with installation procedures 2 1 Installation Safety Warnings 1 Installation Instructions 2 Over temperature 3 Stacking the Chassis 4 During Lightning Electrical Hazard Suitable elect...

Страница 10: ...connectors Refer to the cable manufacturer for special warnings and instructions When this product is mounted or serviced in a rack special precautions must be taken to ensure that the system remains...

Страница 11: ...gle slot and connected to a its corresponding fabric the ConnectX Mezzanine I O card must be installed in the corresponding fabric You must install a module in slots B1 C1 before installing a module i...

Страница 12: ...inst the bar 5 Push the lever on the latching mechanism up making sure that the latching mechanism catches the locking bar The lever should now be parallel to the front panel 6 Check the indicator lig...

Страница 13: ...port receptacle Both LED indicators will turn off when the cable is unseated Care should be taken not to impede the air exhaust flow through the chassis Note Cable lengths should be used which allow...

Страница 14: ...ble in MLNX_OFED to update firm ware for this switch It also can be downloaded from http www mellanox com Downloads Firmware Tools The latest firmware can be found at http www mellanox com Support Del...

Страница 15: ...eck I 32 I skip option set no report will be issued I I Bad Links Info I I No bad link were found I Stages Status Report STAGE Errors Warnings Bad GUIDs LIDs Check 0 0 Link State Active Check 0 0 Perf...

Страница 16: ...mlxburn with the LID retrieved in step 3 above to perform the In Band burning operation Burn the InfiniScale IV switch root mymach mlxburn d dev mst SW_MT48438_lid 0x0003 fw fw IS4 mlx qq I Querying...

Страница 17: ...for the InfiniBand connector does not come on 1 Check that both ends of the cable are connected 2 Check that the locks on the ends are secured 3 Make sure that the latest FW version is installed on b...

Страница 18: ...y Compliance InfiniBand QoS Management Auto Negotiation of 10Gb s 20Gb s or 40 Gb s 9 InfiniBand Virtual Lanes for all ports 8 Data transport lanes and 1 management lane Baseboard Performance and Devi...

Страница 19: ...This equip ment generates uses and can radiate radio frequency energy and if not installed and used in accor dance with the instruction manual may cause harmful interference to radio communications Op...

Страница 20: ...ation of Information and Communication Equipment requires EMC test ing and certification for many electronic products Korean EMC certifications are issued by Radio Research Laboratory RRL which is org...

Страница 21: ...L Module Reset 10 Vcc Rx 3 3 V Power supply receiver 11 SCL 2 wire serial interface clock 12 SDA 2 wire serial interface data 13 GND Ground 14 Rx3p Receiver Non Inverted Data Output 15 Rx3n Receiver I...

Страница 22: ...4 5 6 7 8 9 2 2 2 2 2 2 2 2 2 1 2 3 4 5 6 7 8 3 3 3 3 3 3 3 3 RX4p GND GND GND RX4n RX2p RX2n TX1n GND TX1p GND TX3n TX3p GND IntL ModPrsL VccTx Vcc1 LPMode 18 35 8 50 Top ResetL SDA SCL ModSelL RX3p...

Страница 23: ...tour des ouver tures de ventilation Le ch ssis ne doit pas tre empil sur un autre mat riel Si le ch ssis tombe il peut pro voquer des blessures corporelles et des d gradations de biens Pendant un orag...

Страница 24: ...24 8 Elimination du mat riel 9 Codes lectriques locaux et nationaux L limination de ce mat riel doit s effectuer dans le respect de toutes les l gislations et r glementations nationales en vigueur Ce...

Страница 25: ...w hrleisten Das Chassis sollte nicht auf andere Ger te gestapelt werden Wenn das Chassis herunt erf llt kann es zu Verletzungen und Besch digungen an Ger ten f hren Arbeiten Sie w hrend eines Gewitter...

Страница 26: ...26 8 Ger teentsorgung 9 Regionale und nationale elektrische Bestimmungen Die Entsorgung dieses Ger ts sollte unter Beachtung aller nationalen Gesetze Bestim mungen erfolgen Dieses Ger t sollte unter B...

Отзывы: