![Melchioni MR BIN G Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/melchioni/mr-bin-g/mr-bin-g_user-manual_1766992015.webp)
13
Operation Instruction
Lock
After well set the head.Use the taches to fix
the head by pushing them down (Fig. 9).
Push down.
Fig. 9
Blower function
Insert the hose into the blower stand and turn
it clockwise (Fig. 10).
Fig. 10
Operation
On/Off
Press the on/off button (Fig. 11).
Speed control
Adjust the speed
control as user’s
wish (Fig. 12).
Fig. 11
Fig. 12
Содержание MR BIN G
Страница 2: ......
Страница 39: ......
Страница 40: ...Melchioni Ready S r l Via P Colletta 37 20135 Milano Tel 02 49486000 www melchioni ready com ...