3.1 Important Hints for hot-pluggable IMS Modules
The following points should be strictly observed when replacing IMS modules during operation. Not all IMS
modules are fully hot-pluggable. Of course, it is not possible to replace a power supply unit of a non-redundant
system without first having installed a second power source in operational mode.
The following applies to the individual IMS slots:
PWR:
"hot swappable"
If you operate your system with only one
power supply, a second power supply must
be installed before removing/replacing it
to keep your system functioning.
I/O, ESI and MRI Slots:
"hot swappable".
CLK1, CLK2:
"hot swappable"
Afer the exchange or the installation of a
clock module a rescan of the reference clocks
(Rescan Refclocks) must be executed in the web
interface menu "System".
CPU
not "hot swappable"
The central management unit must be disconnected
from mains before replacement.
RSC/SPT
not "hot swappable"
The RSC switching card must be disconnected
from the mains before the replacement.
6
Date: 26th February 2020
IMS-LNE-GBE-SFP Setup Guide
Содержание IMS-LNE-GBE-SFP
Страница 1: ...MANUAL IMS LNE GBE SFP Setup Guide Hot Plug Module 26th February 2020 Meinberg Funkuhren GmbH Co KG...
Страница 2: ......
Страница 15: ......