3.1 Important Hints for hot-pluggable IMS Modules
The following points should be strictly observed when replacing IMS modules during operation. Not all IMS
modules are fully hot-pluggable. Of course, it is not possible to replace a power supply unit of a non-redundant
system without first having installed a second power source in operational mode.
The following applies to the individual IMS slots:
PWR:
"hot swappable"
If you operate your system with only one
power supply, a second power supply must
be installed before removing/replacing it
to keep your system functioning.
I/O, ESI and MRI Slots:
"hot swappable".
CLK1, CLK2:
"hot swappable"
Afer the exchange or the installation of a
clock module a rescan of the reference clocks
(Rescan Refclocks) must be executed in the web
interface menu "System".
CPU
not "hot swappable"
The central management unit must be disconnected
from mains before replacement.
RSC/SPT
not "hot swappable"
The RSC switching card must be disconnected
from the mains before the replacement.
6
Date: 19th November 2019
BPE-2000
Содержание BPE-2000
Страница 1: ...MANUAL BPE 2000 Setup Guide 19th November 2019 Meinberg Funkuhren GmbH Co KG...
Страница 2: ......
Страница 12: ......