AVTMTTR330 Rev 3 March 2010
14
Figure 4-4. Setup for Testing Single-Phase, Type B (Inverted Design) Step Voltage Regulator
Three-Phase, Two-Winding Transformers
Perform the following setup procedure for three-phase, two-winding
transformers:
1.
With the ON/OFF Switch in the OFF position, make the circuit
connections as described in Section 3.
2.
Connect the H and X test cables to the respective H and X receptacles of the
TTR330. Make sure that the connectors are securely fastened (using
clockwise rotation) to the receptacles.
3.
Connect the heavy-duty clamps marked H0, H1, H2, and H3 of the test lead
to the corresponding (high-voltage winding) terminals of the transformer
under test. Refer to Table 4-2 for test lead markings. With delta connected
windings, H0 is not used. With wye connected windings, a neutral
connection for H0 is normally available.
4.
Connect the heavy-duty clamps marked X0, X1, X2, and X3 of the test lead
to the corresponding (low-voltage winding) terminals of the transformer
under test. Refer to Table 4-2 for test lead markings. With delta connected
windings, X0 is not used. With wye connected windings, a neutral connection
for X0 is normally available.
Содержание Three-Phase TTR
Страница 2: ......
Страница 3: ...Three Phase TTR Transformer Turn Ratio Test Set TTR330 Series...
Страница 8: ...AVTMTTR330 Rev 3 March 2010 iv M...
Страница 38: ...M AVTMTTR330 Rev 3 March 2010 30 M...
Страница 52: ...M AVTMTTR330 Rev 3 March 2010 44 M...
Страница 68: ...M AVTMTTR300 Rev B Sept 2008 60...
Страница 70: ...M AVTMTTR300 Rev B Sept 2008 62 M...