7. The result can be saved by pressing the SAVE button. A
message will inform you the data was saved and which asset
ID it was saved to.
5.3 Supply Phase Rotation
1. Connect the test leads to the MTR105.
1.1. Press the Information (
) button to view the lead set
up diagram.
NOTE:
when the diagram is displayed a test cannot be
performed. Press Information
(
)
button to return to the test
screen
2. Turn rotary switch to select Voltmeter (V) position.
3. Press soft keys 2 and 3 to move the carousel left or right
through sub-modes to Supply Phase Rotation.
NOTE:
The full title text of the sub-mode will appear in the
secondary field for a few seconds.
Voltmeter
30
www.megger.com
Содержание MTR105
Страница 1: ...Baker Instruments MTR105 Rotating Machine Tester User Guide ...
Страница 7: ... www megger com vii ...
Страница 92: ... 86 www megger com ...
Страница 93: ... www megger com 87 ...
Страница 94: ... 88 www megger com ...
Страница 95: ... www megger com 89 ...
Страница 96: ... 90 www megger com ...
Страница 97: ... www megger com 91 ...
Страница 98: ... 92 www megger com ...
Страница 99: ... www megger com 93 ...