18
Extension lead test
(PAT120, 150)
Testing an extension lead or multi-way extension lead
i)
ii)
ii)
Insulation test @ 500 V
OR
Insulation test @ 250 V
>2 s
iv)
v)
vi)
vii)
NOTE
: Multiple earth continuity tests can be carried out by pressing the QT button during the continuity test, and pressing it again for each new continuity test. See Page 13