![MEGAFLO 2sf Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/megaflo/2sf/2sf_instructions-manual_1764802007.webp)
7
Figure 2: Schematic wiring diagram - basic 2 x 2 port valve system
3.3 Electrical diagram
KEY
Br BROWN
Bl BLUE
G GREY
O ORANGE
W WHITE
GY GREEN/YELLOW
DHW DOMESTIC HOT WATER
HTG HEATING
L LIVE
N NEUTRAL
EARTH
BOILER
(DHW)
ZONE VALVE
WIRING CENTRE
1 2 3
9 10
L N
G
Br Bl
O
GY
2
1
3
L N
L
N
PUMP
INDIRECT
THERMAL CONTROLS
(SUPPLIED FITTED)
FUSED (3 AMP)
MAINS SUPPLY
N.B. A DOUBLE POLE ISOLATING
SWITCH MUST BE INSTALLED IN
THE MAINS SUPPLY
NOTES
1. ALL EARTH CONNECTIONS MUST BE LINKED BACK TO THE EARTH TERMINALS IN THE WIRING CENTRE
2. ALL NEUTRAL CONNECTIONS MUST BE LINKED BACK TO THE NEUTRAL TERMINALS IN THE WIRING CENTRE
3. ASSUMES BASIC BOILER
4. THE 22MM MOTORISED VALVES DO NOT HAVE A WHITE WIRE
5. THE ABOVE DIAGRAM IS FOR GUIDANCE ONLY, THE MANUFACTURER ACCEPTS NO LIABILITY FOR ANY LOSS OR DAMAGE ARISING FROM
ANY ERRORS OR OMISSIONS THAT MAY BE INADVERTENTLY CONTAINED WITHIN THIS DIAGRAM. THE VARIOUS EQUIPMENT
MANUFACTURERS SHOULD BE CONSULTED TO CONFIRM THE CORRECT OPERATION OF THEIR PRODUCTS WITHIN THE SYSTEM
11
13
12
14 15 16
N
N
N
N
(SUPPLIED FITTED)
(SUPPLIED FITTED)
PROGRAMMER - HEATING ZONE
1
& DOMESTIC HOT WATER
(SUPPLIED)
L N
HTG
DHW
ON
ON
4 3 5 6
ROOM SENSOR
(SUPPLIED)
N
HEATING ZONE 1VALVE
G
Br Bl
O
GY
N
(SUPPLIED FITTED)
W
HEATING ZONE 2 VALVE
G
Br Bl
O
GY
N
W
PROGRAMMABLE
ROOM THERMOSTAT
FOR ZONE 2
1 2
4 5
6 7 8
Содержание 2sf
Страница 27: ...27 Figure 19 SystemReady exploded view 13 20 10 06 09 20 12...
Страница 28: ...28 14 15 19 11 16 7 17 3 21 18 Figure 20 Indirect exploded view...
Страница 29: ...29 NOTES...
Страница 30: ...30 Benchmark checklist...
Страница 31: ...31 Commissioning service records...
Страница 35: ...35 NOTES...