20

WARNING

 

`

If the unit is to be left unused following 
installation and commissioning e.g. 
unoccupied properties, the water heater 
should be drained or regularly flushed 
through with fresh mains water once a 
week.

 

`

When placing the unit into service, the 
procedure for filling the unit and the 
system checks above should be observed.

7.2 Checklist before commissioning

 

`

Check all water connections for leaks and rectify as 
necessary.

 

`

Turn off mains water supply.

 

`

Remove the pressure reducing valve head work to 
access the strainer mesh, clean and re-fit.

 

`

Turn the water supply back on.

 

`

Manually open, for a few seconds, each Relief Valve 
in turn, checking that water is discharged and runs 
freely through the tundish and out at the discharge 
point.  

 

`

Ensure that the valve(s) re-seat satisfactorily.

7.3 Commissioning procedure

Indirect units

 

`

Ensure the filling loop hose is connected at both ends 
and is tight.

 

`

Fill the indirect (primary) circuit following the boiler 
manufacturer’s commissioning instructions.

 

`

Open the isolating valves at either end of the filling 
loop and allow to fill from the mains inlet supply.

 

`

To ensure the appliance primary heat exchanger is 
filled, both of the 2 port motorised valves (supplied) 
should be manually opened by moving the lever on 
the motor housing to the MANUAL setting. When 
the primary circuit is full return the lever to the 
AUTOMATIC position. 

 

`

Air can be vented from the primary heating coil by 
unscrewing the small dust cap on the auto air vent 
by half a turn.

 

`

The primary system should be pressurised to the 
minimum pressure required by the boiler (usually 1 
bar), the pressure gauge fitted should be used to 
ensure the correct system pressure is set.

 

`

When full and pressurised, the filling loop isolating 
valves should be closed, the pipe disconnected and 
the caps replaced. The levers on the motorised valves 
should be returned to the Auto position. 

 

`

Check primary circuit for leaks and rectify as necessary 
Switch on the boiler, ensure the programmer is set to 
Hot Water and allow the cylinder to heat up to a 
normal working temperature (70

o

C recommended).

7. Commissioning

7.1 General

After filling the installation with water in the previous 
section please follow the following steps to complete the 
installation of the unit.

WARNING

DO NOT operate the immersion heaters or 
primary circuit until the appliance has been 
filled with water.

Direct Heating

 

`

Switch on electrical supply to the immersion heater 
and allow the appliance to heat up to normal working 
temperature, factory set to 57°C but for maximum 
water availability  reset to 70°C (see Fig 16 page 19). 

 

`

The adjustment represents a temperature range of 
10°C to 70°C.

 

`

Check the operation of thermostat and that no 
water has issued from the Expansion Relief Valve or 
Temperature/Pressure Relief Valve during the heating 
cycle.

Benchmark

 

The cylinder is covered by the Benchmark Scheme 
which aims to improve the standards of installation 
and commissioning of domestic heating and hot water 
systems in the UK and to encourage regular servicing to 
optimise safety, efficiency and performance.

Benchmark is managed and promoted by the Heating 
and Hotwater Industry Council. For more information 
visit www.centralheating.co.uk.

All installations must be notified to Local Area Building 
Control either directly or through a Competent Persons 
Scheme. A Building Regulations Compliance Certificate 
will then be issued to the customer who should, on 
receipt, write the Notification Number on the Benchmark 
Checklist.

This product should be serviced regularly to optimise its 
safety, efficiency and performance. The service engineer 
should complete the relevant Service Record on the 
Benchmark Checklist after each service.

The Benchmark Checklist may be required in the event of 
any warranty work.  

Содержание 2sf

Страница 1: ...Compact SystemReady Hot Water Cylinders Unvented Indirect Important Please read understand all these instructions before commencing installation Please leave this manual with the customer for future r...

Страница 2: ...shooting 23 10 1 Fault finding 23 11 Decommissioning 24 11 1 Decommissioning procedure 24 12 1 Spare parts list 25 Benchmark checklist 30 Commissioning service records 31 Warranty 32 THE BENCHMARK SCH...

Страница 3: ...pliance Faulty or insufficient maintenance of the appliance Failure to abide by the instructions on installing the product Installer s liability The installer is responsible for the installation and t...

Страница 4: ...erious physical injury if the safety instructions in this manual are not adhered to CAUTION Do not operate immersion heaters until the appliance has been filled with water WARNING When handling the ap...

Страница 5: ...51 Coil heat up times 15l min 33 1 40 1 43 0 45 1 30l min 26 9 30 2 34 8 37 7 45 min 25 0 28 8 32 3 34 2 Coil rating kW 15l min 13 1 12 7 13 7 14 3 30l min 16 3 16 3 17 1 17 3 45l min 17 6 17 7 18 8 1...

Страница 6: ...ons Figure 1 General dimensions SystemReady Table 3 General dimensions table SystemReady Size DIMENSIONS mm A B C 2sr N A 728 1130 4sr N A 883 1256 6sr N A 1008 1413 8sr 900 1084 1515 355 A B C 316 42...

Страница 7: ...LINKED BACK TO THE NEUTRAL TERMINALS IN THE WIRING CENTRE 3 ASSUMES BASIC BOILER 4 THE 22MM MOTORISED VALVES DO NOT HAVE A WHITE WIRE 5 THE ABOVE DIAGRAM IS FOR GUIDANCE ONLY THE MANUFACTURER ACCEPTS...

Страница 8: ...excellent standard of corrosion resistance The outer casing is a combination of resilient thermoplastic mouldings and pre coated steel All products are insulated with CFC free polyurethane foam to gi...

Страница 9: ...the point of most frequent use Avoid siting where extreme cold temperatures will be experienced All exposed pipe work should be insulated The discharge pipe work from the safety valves must have minim...

Страница 10: ...ot to scale The boiler should have a control thermostat and non self resetting thermal cut out and be compatible with unvented storage water heaters Should be a sealed system maximum primary pressure...

Страница 11: ...owers and baths The mixing valve can be installed in any orientation providing the pipe from the tank outlet to the H port of the valve is no more than 500mm long and has no other connections attached...

Страница 12: ...e if the capacity of the secondary circuit exceeds 10 litres Pipe capacity copper 15mm O D 0 13 l m 10 litres 77m 22mm O D 0 38 l m 10 litres 26m 28mm O D 0 55 l m 10 litres 18m Note Plastic pipe capa...

Страница 13: ...ge 3 bar Combination T P ERV T P Temperature and Pressure ERV Expansion Relief Valve Mains water supply 90 Tundish T P actuation knob ERV actuation knob D2 Pipe Figure 9 Isolation and 3 bar pressure r...

Страница 14: ...cock can be fitted here MCWS to Kitchen unbalanced cold mains supply Mains Cold Water Supply KEY MCWS Mains Cold Water Supply HWS Hot Water Service SC Stop Cock Isolating Valve DOC Drain Off Cock Dis...

Страница 15: ...t and the tundish see fig 12 Note To comply with the Water Supply Water Fittings Regulations the tundish should incorporate a suitable air gap 3 55 Any discharge should be visible at the tundish In ad...

Страница 16: ...positioned to prevent contact whilst maintaining visibility and c discharges at high level e g into a metal hopper and metal downpipe with the end of the discharge pipe clearly visible or onto a roof...

Страница 17: ...Temperature relief valve Metal discharge pipe D1 from Temperature relief valve to tundish Tundish Discharge below fixed grating Building Regulation G3 section 3 61 gives alternative points of discharg...

Страница 18: ...ication labels within the wiring centre to aid in connecting the various external system components such as the mains supply programmer and boiler Back up immersion heater The back up immersion heater...

Страница 19: ...ry heat exchanger coil For further details of wiring the boiler or external controls consult the manufacturer s installation instructions Figure 15 Direct wiring schematic Figure 14 Indirect wiring sc...

Страница 20: ...the caps replaced The levers on the motorised valves should be returned to the Auto position Check primary circuit for leaks and rectify as necessary Switch on the boiler ensure the programmer is set...

Страница 21: ...low of primary water around the heat exchanger coil when the control temperature has been reached http www baxi co uk information and advice how to videos htm The controls fitted to the cylinder will...

Страница 22: ...urn on isolating valve or main stop cock to the system Check for leaks Descaling immersion heater Draining appliance Turn off the mains water supply isolate the electrical supply and turn off boiler A...

Страница 23: ...alve Thermal control failure CAUTION Water will be very hot Switch off power to immersion heater and shut down boiler DO NOT turn off water supply When discharge stops check all thermal controls repla...

Страница 24: ...f Waste Equipment by Users in Private Households in the European Union This symbol on the product indicates that this product must not be disposed of with your other household waste Instead it is your...

Страница 25: ...347 96 8 Set of compression nuts and olives NOT SHOWN 95 607 838 9 Drain valve 1 4 turn 95 605 051 10 22mm Manifold 70 316 93 11 Direct combined thermostat thermal cut out 70 316 88 12 Wiring centre 9...

Страница 26: ...Cartridge 3 Bar Strainer Mesh 3 Bar Pressure Reducing Valve Complete 2 Figure 17 Exploded view of 3bar pressure reducing valve Figure 18 Mixing valve Hot water from cylinder Cold water from Mains Mix...

Страница 27: ...27 Figure 19 SystemReady exploded view 13 20 10 06 09 20 12...

Страница 28: ...28 14 15 19 11 16 7 17 3 21 18 Figure 20 Indirect exploded view...

Страница 29: ...29 NOTES...

Страница 30: ...30 Benchmark checklist...

Страница 31: ...31 Commissioning service records...

Страница 32: ...ngineer and any replacement parts used on the Megaflo Compact product are authorised Megaflo Compact spare parts The factory fitted Temperature Pressure Expansion Relief Valve has not been tampered wi...

Страница 33: ...home continues to own the property Should the property be sold the new owner and any subsequent owners will receive a 25 year warranty from the date the original owner purchased the Megaflo Compact or...

Страница 34: ...dlesex UB4 0TY Tel 020 8606 3567 Parts Center Tel 0344 292 7057 www partscenter co uk Newey Eyre Unit 3 5 Wassage Way Hampton Lovett Ind Estate Droitwich Worcestershire WR9 0NX Tel 01905 791500 Fax 01...

Страница 35: ...35 NOTES...

Страница 36: ...ing regulations outside of the UK contact your local Authority For spares stockists guarantees and warranty outside the UK contact your local supplier or Export Sales T 44 0 1603 420271 F 44 0 1603 42...

Отзывы: