Cleaning and maintenance
Installation Maintenance:
The operator has to make sure that the unit is operating safely and has the installa-
tions and electronics checked by an expert every 2 years.
The following points have to be considered during the inspection:
1) All screws used for installing the device or part of the device have to be tightly connected and must not be corroded.
2) There must not be any deformations on the housing, fixation and installation spots (ceiling, suspension, trussing).
3) The power supply cables must not show any damages, material fatigue (e.g. porous cables) or sediments. Further
instructions depending on the installation spot and usage have to be adhered by a skilled installer and any safety
problems have to be removed.
Caution Danger to life!
Disconnect from mains before starting maintenance operation!
Note:
There is no serviceable parts inside the device except for the LED’s. Maintenance and service operations are
to be carried out by authorized dealers.
Replacing the fuse:
Only replace the fuse with the same type and rating.
Replacing the power cable:
If the power cable of this device becomes damaged, it has to be replaced by author-
ized dealers only
Should you have further questions , please contact your dealer.
7
Parts List
MC1060-ts
Terminator Switch
MC1060-ps
Power Switch
MC1060-pc
Power Connection
MC1060-mpcb
Main PCB Card
MC1060-xlr3m
3 Pin XLR Male
MC1060—xlr3f
3 Pin XLR Female
MC1060-xlr5m
5 Pin XLR Male
MC1065-merpcb
Merger PCB
Содержание MC1065
Страница 2: ......