Installation Guide
12
Meeting Pod Installation Guide [email protected]
-
Place 2 x 25mm x 6mm bolts over 2 x m6 penny washers. Place bolts
through the opening holes on the right hand pod (when facing the
product)
-
Place 2 x m6 penny washers and 2 x m6 onto the male end of the bolts.
Hand tighten
-
Ensure top join of pods are in correct alignment
-
Left hand nut will require open ended m10 spanner
-
Right hand bolt will require a m10 spanner with extension bar to gain
access to turn tight.
-
Tighten bolts in clockwise motion
Front Glass Enclosure
Tools required: 2 x 10mm glass wings, 2 x 8mm glass doors, 10 x glass adapters,
4 x glass to glass hinges, 2 x glass handles, 2 x silicone stopper, glass adapter
key (supplied), m6 Alan key, pozi screwdriver and packers
-
Locate front left and right pods, putting them near the desired end
location. Pods can be located via labelling system on the front face of
the pod
-
Wipe clean bolting surface of glass and pod
-
Ensure floor is clean and free of debris