Here at Meet PAT™ we are very safety conscious. We design and manufacture water 
related products with the safety of you, the user, foremost in mind. In addition, we 
ask that you exercise a degree of care when using any Meet PAT™ product.

IMPORTANT SAFEGUARDS FOR YOUR MEET PAT UNITS

• 

Carefully read all instructions before operation and save them for future reference.

• 

Find a suitable location for setting up the units.

• 

Do not set the units up near live exposed electrical connections or wiring.

• 

Check the quality and potability of the water source and that there is correct pressure.

• 

Set up all connections before turning on the water supply.

• 

Once the water supply is turned on check each unit’s connections for leakages. If a 
leakage is found turn off the water supply and remove the pressure from the units by 

pressing the refill buttons. Unplug the leaking connection and check for damage or dirt. 

Do not use if any leaks are prevalent. 

• 

Units can be heavy to install, use the appropriate number of people and equipment. 

• 

Ensure the units are regularly cleaned and serviced.

•  If applicable, ensure the water filters are replaced as required.

Meet PAT™ takes no responsibility for suitability of install location, clearance for traffic, pedestrians or 
other clearance requirements. Meet PAT™ recommends that the chosen locations are reviewed for OHS 
and suitable other parties (including council) to ensure compliance. Meet PAT™ takes no responsibility for 
the structural integrity of the mounting surface chosen and recommends consultation with an engineer or 
suitable other parties prior to mounting. 

For individual material, component or further installation details, please contact Meet PAT™ sales. Meet 
PAT units have a maximum working pressure of 6 bar - 600kpa (87 psi/ 0.6MPa). Customer or installer to 
check pressure and install pressure relief valve on supply side if required. 

Meet PAT™ products must be installed in accordance with the provisions of AS/NZS3500 and any 
relevant local regulations. Installations not complying with AS/NZS3500 may void the product and 
performance warranty provisions. 

All recommendations within this document should be used as a guide only. Users and 
installers should seek suitable assistance to ensure units comply with all standards and are 
safe for use.

Содержание MP-TO-01

Страница 1: ...ownsend Street Albury NSW 2640 Australia Phone 02 60217813 61260217813 Email sales meetpat com au Meet PAT Meet PAT Limited NZ meetpat co nz 12 Bethlehem Road Bethlehem Tauranga 3100 THE one permanent...

Страница 2: ...not use if any leaks are prevalent Units can be heavy to install use the appropriate number of people and equipment Ensure the units are regularly cleaned and serviced If applicable ensure the water...

Страница 3: ...hin the units The units are mounted to a 8mm powder coated steel bollard Graphics panels are made from clear high impact spray paint uv and scratch resistant polycarbonate sheet The graphics are back...

Страница 4: ...kpa operating pressure Filter 5 micron carbon filter Flow Rate 5L per minute pressure dependent Power None Flow Meter Digital in litres Minimum Working Temp 1 C Water Supply Connection 1 2 inch supply...

Страница 5: ...many different positioning options These options can allow you to install a unit very cost effectively with minimal infrastructure changes Water supply The unit can be connected to any existing potabl...

Страница 6: ...te slab using the mounting bracket Units can bolt directly onto existing ooring structure Connect through to existing connections on the other side of walls Connect waste water into existing drainage...

Страница 7: ...5mm Attaching to an existing structure Embedding in concrete Installation Kit Not included Base plate sizing Unit can be xed to any ooring structure Meetpat recommends 4 x M12 Countersunk Stainless St...

Страница 8: ...luded Length and type of the fastener to be con rmed by installer Unit can be embedded into a new concrete slab Meetpat recommends a minimum slab size of 550W x 550L x 200mmD This may need to be incre...

Страница 9: ...m slab size of 550W x 550L x 200mmD This may need to be increased or reinforced depending on sub surface conditions Con rm with installer for suitable slab site Please contact Meetpat for a installati...

Страница 10: ...pat com au Meet PAT Meet PAT Limited NZ meetpat co nz 12 Bethlehem Road Bethlehem Tauranga 3100 Panel replacement 3mm Allen Key Screws x 3 Clockwise to loosen 1 2 3 3mm Allen Key Screws x 4 Clockwise...

Страница 11: ...ed NZ meetpat co nz 12 Bethlehem Road Bethlehem Tauranga 3100 Panel replacement 8mm Allen Key Screws x 1 Anti Clockwise to loosen 7 8 9 Putting it back together All nished and need to put the unit bac...

Страница 12: ...unit to a pressurized water source and check for any leaks If a leak is found turn off the water supply and check connections Disconnect water supply Disconnect or turn off the water supply De pressu...

Страница 13: ...y the total liter count up 3000lt Attention 1 Do not spray water into or around the ow meter 2 Be careful to not damage the wires when removing the ow meter 3 For replacement parts and troubleshooting...

Страница 14: ...ff bracket 2 4mm Allen Key Screws x 4 Anti Clockwise to loosen Only portable models will have a bracket 4 x 2 1 I look like this Record ow meter data If still displayed record the ow meter data Once t...

Страница 15: ...to change without notice This technical sheet is copyright and owned by Meet PAT Products and Things Pty Ltd as a trustee for Meet Pat Unit Trust ABN 42634465637 All rights are reserved All products...

Отзывы: