On first use, the 977HL needs to be configured to suit the type of installation and the
type of ionising equipment connected to it. This includes basic settings of the Output
Power, Rate and Balance as well as alarm functionality and the lock option.
Setting the Start Voltage and Ion Output Set Point
During installation and commissioning two parameters must be set correctly to allow
optimum performance.
1. Start Voltage. When used with a 976EX bars the voltage should be set to 9.6kV
2. Ion Output Set Point: This is the target Ion Output as measured when the system is
clean. The 977HL self adjusts to try to maintain the output at this level.
This value should only be set when the ionisers have been cleaned, otherwise the
performance of the system will be reduced.
To set the Start Voltage and Ion Output Set Point
1. Press
to enter menu
2. Press
to enter option 1 “Power”
3. Use
and
to set voltage to required voltage.
4. Press
to accept value. The unit will display “Set Ion Output”
Содержание 977HL
Страница 1: ...Model 977HL Operating Manual Current Monitoring Pulsed DC Controller for Hazardous Location Ionisers...
Страница 2: ......
Страница 4: ......
Страница 11: ...9 4 Connect IEC mains cable Input voltages from 100 to 240V 50 or 60Hz are acceptable...
Страница 23: ...977HL Case and Mounting Detail 21...
Страница 26: ......
Страница 27: ......