background image

www.medoraco.com | 866 - 437 - 8076 | [email protected]

Warranty

151_10150_20180927

Solar SB Mixers Limited Replacement Warranty:

SolarBee SB Mixers.  

All new and factory-refurbished SolarBee SB mixers and circulators are warranted to 

be free of defective parts, materials, and workmanship for a period of two years from the date of installation.  

SolarBee SCADA and any optional accessories are considered “buyout” items for Medora Corporation, and as 

such include a warranty against defects in material and workmanship for two years from the date of purchase.  

Parts that are determined by Medora Corporation to be defective in material or workmanship under normal use 

during the two year warranty period will be repaired or replaced.  Any shipping charges that may apply are the 

responsibility of the customer.  A manufacturer’s warranty exceeding this SolarBee warranty, such as

photovoltaic modules (solar panels), which currently have a manufacturer’s 25-year performance warranty, will 

be honored. This warranty is valid only for SolarBee equipment used in accordance with the owner’s manual, 

and consistent with any initial and ongoing factory recommendations. This warranty is limited to the repair or 

replacement of defective components only and does not apply to normal wear and tear.  If the factory’s service 

crews performed the original on-site placement and startup, then this warranty also includes labor.  Where 

labor is included, in lieu of sending a factory service crew to the site for minor repairs, Medora Corporation may 

choose to send the replacement parts to the owner postage-paid and may pay the owner a reasonable labor 

allowance, as determined solely by Medora, to install the parts.   There is no liability for consequential damages 

of any type.  The warranty that is submitted and provided with the purchased equipment is the valid warranty. 

In addition, the SolarBee brushless motor is warranted for a period of ten years from the date of

installation.  

The first two years will be covered under the above warranty of the mixer.  There will be an

additional eight years of extended parts only warranty on the SolarBee brushless motor. 

Terms applicable to all equipment.

  There is no liability for any consequential damages of any type, or to 

replace items that wear out from “normal use” in Medora’s sole determination.  Equipment warranties are valid 

only for equipment that is used in accordance with the owner’s manual, and consistent with any initial and

ongoing factory recommendations.  Medora Corp.’s warranties change from time to time; only the exact

warranty in effect  when the equipment was purchased, as provided with the equipment, is valid.

EXCEPT AS STATED ABOVE, MEDORA CORP. AND ITS AFFILIATES EXPRESSLY DISCLAIM ANY AND ALL

EXPRESS OR IMPLIED CONDITIONS, REPRESENTATIONS AND WARRANTIES ON PRODUCTS

FURNISHED HEREUNDER, INCLUDING WITHOUT LIMITATION ALL IMPLIED WARRANTIES OF

MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE.

Please consult your state law regarding this warranty as certain states may have legal provisions affecting the 

scope of this warranty.

IN NO EVENT WILL MEDORA CORP. OR ITS AFFILIATES BE LIABLE FOR ANY DAMAGES CAUSED BY FAILURE OF 

BUYER TO PERFORM BUYER’S RESPONSIBILITIES OR FOR FOLLOWING MEDORA CORP. ADVICE.  IN NO EVENT 

WILL MEDORA CORP. OR ITS AFFILIATES BE LIABLE FOR ANY LOST PROFITS OR USE OR OTHER PUNITIVE,

SPECIAL, EXEMPLARY, CONSEQUENTIAL, INCIDENTAL OR INDIRECT DAMAGES, HOWEVER CAUSED, ON ANY 

THEORY OF LIABILITY, WHETHER OR NOT MEDORA CORP. HAS BEEN ADVISED OF SUCH DAMAGES, OR

REASONABLY COULD HAVE FORESEEN THE POSSIBILITY OF SUCH DAMAGES, OR FOR ANY CLAIM AGAINST 

BUYER BY ANOTHER PARTY.

O&M_SB2500_20181115 - 37

Содержание SolarBee SB2500

Страница 1: ...www medoraco com 866 437 8076 info medoraco com O M_SB2500_20181115 SB2500 Owner s Manual...

Страница 2: ...Plants Potable Storage Tanks or Wastewater Treatment Processes equipment continues to be at the forefront as the 1 world leader for in situ water body treatment www medoraco com 866 437 8076 info medo...

Страница 3: ...operate this unit Accidents occur every year because of careless use of industrial equipment You can avoid hazards by following these safety instructions and applying some ordinary common sense when...

Страница 4: ...ional Safety and Health Administration Use necessary PPE when placing and servicing this unit ELECTRICAL HAZARD WARNING THIS EQUIPMENT CONTAINS HIGH VOLTAGE ELECTRICAL SHOCK CAN CAUSE SERIOUS OR FATAL...

Страница 5: ...y and health programs approved by OSHA Protect Yourself Medora Corporation insists that you comply with all relative OSHA and local regulations while installing and performing any maintenance to the m...

Страница 6: ...needs from the sun Its solar panels provide power to the onboard battery which energizes the drive system s controls and motor The new Technology allows excess solar energy to be stored during the da...

Страница 7: ...which individually connect to the digital controller A bird deterrent is located directly above the PV modules to prevent bird fouling The PV modules have 3 angle settings that are set at the factory...

Страница 8: ...uick access to the interior components of the machine Each gate opens by simply removing a pin on the latch end Onboard Battery The onboard battery is located directly below the dish in a stainless st...

Страница 9: ...operates the brushless motor There are 3 PV module connections located on the front face of the digital controller If the onshore power accessory was purchased a connection will be located on the righ...

Страница 10: ...o the main control center Due to the high frequency of communication between the motor controller and brushless motor the two components need to be located close to one another This is the primary rea...

Страница 11: ...DURES AND EQUIPMENT NECESSARY WITH A SOLARBEE SERVICE TEAM MEMBER Shaft Coupling The shaft coupling connects the brushless motor drive shaft to the impeller shaft The shaft coupling is located directl...

Страница 12: ...rronds the impeller shaft The freeze sleeve is free to rotate on the shaft If the water should freeze around the machine the freeze sleeve will stand still frozen in by the ice but inside the plastic...

Страница 13: ...3 4 inch to 1 inch 2cm to 2 5cm below the surface of the water to achieve best flow results The distributor dish depth is set by rotating the turnbuckles located on the float arms Hose Strainer On th...

Страница 14: ...e will cause the lip of the distributor dish to lower The turnbuckle and float arm structure components are constructed with robust stainless steel materials allowing the SolarBee to operate in severe...

Страница 15: ...have limited adjustment Floats The SolarBee has 3 floats made from high density Polyethylene The floats are filled with a Polystyrene closed cell foam for long term buoyancy The floats have a uniquel...

Страница 16: ...contains swivels approximately every 15 ft 4 5m to prevent the chain from twisting and tangling A 7 1 scope is generally preferred for the length of anchor chain For example if the pond is approximat...

Страница 17: ...or reservoir and tied to both tether posts The SolarBee has 2 short chains running from two of the float plates on the machine out to the cable line running across the pond or reservoir The tethering...

Страница 18: ...arBee field teams use 12 ft 3 65m Jon boats that work fine for almost all applications It is extremely important that safety comes first every time the SolarBee is inspected or having maintenance proc...

Страница 19: ...les or birds are not kept completely off by the bird deterrent resulting in the panel s effective surface area decreasing TOOLS RECOMMENDED Squeegee Glass Cleaner Paper Towel or Wash Cloth STEP 1 Rins...

Страница 20: ...d fall or year round if no adjustment is preferred OR Where Locations south of 40 degree latitude When During winter Use 55 Degree Steepest Position Where Locations north of 40 degree latitude When Du...

Страница 21: ...counting each full revolution of the flag indicator starting with ZERO ONE TWO etc for a time of less than or equal to 1 minute and at least 20 seconds This step is easier with two people one countin...

Страница 22: ...and shaft Place the debris into a garbage bag and remove from pond to prevent it from going through SolarBee again Follow all local laws and regulations when disposing of any materials collected STEP...

Страница 23: ...ris into a garbage bag and remove from pond to prevent it from going through SolarBee again Follow all local laws and regulations when disposing of any materials collected STEP 5 Once clean place impe...

Страница 24: ...tends out from the machine This can be done using a tape measure by approximating the height of a nickel or locating the notch on each chain bracket for machines having a hose If using the notch on ea...

Страница 25: ...with a SolarBee service team member STEP 2 Use the tape measure to determine how deep the pond at the SolarBee unit STEP 3 Locate the white float ball that is on one of the floats This float ball mark...

Страница 26: ...the chain that attaches to the submerged strainer STEP 3 Using rubber gloves pull up on the chain until the strainer is above the water If there is debris or garbage on the strainer remove it place it...

Страница 27: ...e 13mm wrenches loosen and remove the upper bolt and locking nut This will allow the battery lid to be opened up If possible allow the battery lid to lay down on a stable part of the boat STEP 5 First...

Страница 28: ...oose Once the first mooring block is popped free pull up more anchor chain and pop the second mooring block STEP 4 Once both mooring blocks are loose from the bottom pull them up so they are off the b...

Страница 29: ...ation such as ice fishing snowmobile traffic or other activities on the water body during winter For these locations SolarBee strongly recommends turning the machine off by late fall Nov 15th in U S b...

Страница 30: ...er Inside Low Profile Battery Inside Low Profile PV Module s Solar Panel s 1 3 Depending on Machine Model PV Inputs 1 3 Outside of Reservoir Inside Low Profile Inside of Reservoir Motor Power and SCAD...

Страница 31: ...ed the yellow light will flash rapidly followed by the green light Upon completion the brainboard will restart and perform a system check Following a successful update the red light blinking once foll...

Страница 32: ...this order is not followed component damage may occur STEP 5 6 Disconnect the motor controller from the digital controller and from the motor if needed Complete Power Up Procedure NO TOOLS REQUIRED S...

Страница 33: ...ke Type Inverted bell shape strainer with 3 inch 7 6 cm holes Intake Depth Adjustment Can vary from 0 to 60 feet 0 to 18m No depth adjustment necessary for fluctuations in water level Weight and flota...

Страница 34: ...r and of blinks in succession and solid green LED off or on 3 Using the LED label match your blink observations to the corresponding indication Use the information on the next two pages to proceed DC...

Страница 35: ...side of Zahn board takes a 20 Amp Fuse Disconnect power before changing fuses Blown fuses may be difficult to observe so a continuity tester or new fuse should be used to confirm that the problem is...

Страница 36: ...KS THREE 3 YELLOW BLINKS FOUR 4 YELLOW BLINKS FIVE 5 YELLOW BLINKS 10 BLINKS RED YELLOW AND GREEN AT ONCE ONE 1 YELLOW AND GREEN AT ONCE ZAHN BOARD LED SOLID GREEN LIT SOLID GREEN NOT LIT BEHAVIOR VIS...

Страница 37: ...bly 04 PN 18260225 Float Arm Assembly 05 PN 24010100 Float 06 PN 18265000 Turnbuckle Assembly 07 PN 14300000 Control Box 08 PN 14013022 Motor Control Cord 09 PN 20504500 14 Brushless Motor 10 PN 14285...

Страница 38: ...www medoraco com 866 437 8076 info medoraco com SB2500 Dimension Drawing SB2500 Dimension Drawing 573_10256_20180907 O M_SB2500_20181115 36...

Страница 39: ...al damages of any type The warranty that is submitted and provided with the purchased equipment is the valid warranty In addition the SolarBee brushless motor is warranted for a period of ten years fr...

Страница 40: ...ice and Placement Technicians are trained in Confined Space Fall Protection and other related subjects as required by OSHA to perform the necessary work to install or remove SolarBee and GridBee equip...

Отзывы: