Page 23
Mcro19 - Operator’s Manual
August 2021
Secton 7 - Operatng Instructons and Functon Tests
Maintenance Lock
Raise the platform approximately 7.2ft / 2.2m from the ground.
Rotate the Maintenance Lock away from the machine and let it hang
down.
Lower the platform until the Maintenance Lock rests securely on the
link. Keep clear of the Maintenance Lock when lowering the platform.
1.
2.
3.
ART_4995
Maintenance
Lock
Don’t engage the Maintenance Lock unless the platform in empty of tools
and material.
To Extend and Retract the Deck Extension
Press the platform lock pin foot pedal on the extension deck.
Push the platform extension guardrail to extend the platform to the
desired position.
Do not stand on the platform extension while extending or retracting it.
1.
2.
ART_4996
Deck Extension
Release Pedal
IF THE ROLL-OUT DECK IS EXTENDED CHECK FOR CLEARANCE
UNDER DECK AREA BEFORE LOWERING PLATFORM.
Error Indicator Readout
Consult the Service & Parts Manual for Alarm Code descriptions.
ART_4985