FIG. 4
FIG. 5
NET320_247M
www.medalsports.com
6
(Continued on the next page)
ASSEMBLY
English
Top Guide Rope
Bottom
Guide Rope
3 feet - 5 feet
3 feet - 5 feet
Stakes
Stretch the assembled Net and poles across the playing area until the Net is taut. Holding the poles in the vertical
position, press the guide rope stakes into the ground at a 45º angle, 3 feet to 5 feet from the pole and 3 feet to 5 feet
apart. Make sure that the hooks on the stakes are facing away from the poles. See FIG. 4 and 5.
Make the loops on the bottom guide rope tension clips large enough to slip over the stakes already in the ground.
Make sure that the guide rope loops are placed under the stake hooks as shown in FIG. 5.
BOTTOM GUIDE ROPE SET UP
NET SET UP
Note: Slide the tension clips to
adjust the net tension and ensure
the pole is upright.
Bottom Guide Rope
Top Guide Rope
Bottom Guide Rope
Loop
Ground Stake
Hook
Tension Clips
Содержание NET320 247M
Страница 1: ...877 472 4296 Assembly Instructions MODEL NET320_247M www medalsports com...
Страница 12: ...www medalsports com...