1-7
English
Main Drain Pipe
Feed Water
Flexible Drain Hose
Drain Test
NOTE
This Indoor Unit uses a drain pump for condensed water drainage. Install the unit horizontally to prevent water
leakage or condensation around the air outlet.
•
The front panel can only be fitted in one direction, follow the piping direction. (Follow piping arrow sticker on front
panel)
•
Be sure to remove the installation template before installing the front panel.
Panel Installation
Open
Screw
•
Open the air intake grille by pulling back the catchers and removing it together with filter from panel.
•
Install the front frame panel onto the indoor unit by 4 screws and tighten it completely to prevent cool air leakage.
•
Connect the LED wire and air swing wire to the indoor unit.
Indoor Unit
Pipe Clamp
GOOD
BAD
Drain Piping Work
•
Drain pipe must be in downward gradient for smooth
drainage.
•
Avoid installing the drain pipe in up and down slope to
prevent reversed water flow.
•
During the drain pipe connection, be careful not to exert
extra force on the drain connector at indoor unit.
•
The outside diameter of the drain connection at the
flexible drain hose is 20mm.
•
Be sure to execute heat insulation (polyethylene foam
with thickness more than 8.0mm) on the drain piping to
avoid the condensed water dripping inside the room.
•
Connect the main drain pipe to the flexible drain hose.
•
Feed water from flexible drain hose to check the piping
for leakage.
•
When the test is completed, connect the flexible drain
hose to the drain connector on the indoor unit.
CK20A(1-16)ENG
2/1/01, 10:15 AM
7