MC3 CDLR Скачать руководство пользователя страница 4

 

CDLR Conveyor   

Operation and Maintenance Manual 

 

Rev. 0 
2021-01-26 

 

 

 

 

Introduction 

 
The management and employees of MC3 Manufacturing 
Inc. thank you for specifying our equipment. 
 
This  manual  provides  information  on  how  to  install, 
operate, and maintain your new conveyor. 
 
If special circumstances or questions arise please contact 
MC3  Manufacturing  Inc.  at:  (519)  325-1370  quoting  the 
serial number(s) of the machine(s).  
 

Note:

 The serial number(s) can be found on a rectangular 

plate next to the drive unit. 
 

Delivery Inspection 

Upon  delivery  of  your  Slider  Bed  conveyor  check  your 
packing slip or bill of lading accompanying the unit.  If any 
components are missing contact MC3 Manufacturing Inc. 
immediately  with  a  description  of  the  missing 
components and the serial numbers(s) of the machine(s).    
 
If any components have been damaged in transit, note it 
on the bill of lading and contact the Carrier immediately. 

 
 
 

Warranty 

 

a)

 

Seller  warrants  that  the  material  and 
workmanship  on  the  equipment  manufactured 
by MC3 Manufacturing will be free from defects 
at  the  time  of  shipment.  If  during  the  first  12 
months (or 2000 hours, whichever comes first) of 
operation  after  final  shipment,  the  Buyer 

establishes  to  the  Seller’s  satisfaction  that  any 

part 

or 

parts 

manufactured 

by 

MC3 

Manufacturing  was  defective  at  the  time  of 
shipment,  MC3  Manufacturing,  at  its  own 
expense,  will  repair  or  replace  (but  not  install) 
replacement  parts.  Buyer  must  contact  MC3 
Manufacturing  within  12  months  after  delivery 
to  user  to  allow  any  warranty  coverage  to  be 

applied.  Seller’s  liability  under  this  warranty  is 

limited to replacement parts only and the Seller 
will make no allowance for corrective work done 

unless  agreed  to  in  writing  by  MC3 
Manufacturing. Charges for correction of defects 
by others will not be accepted unless agreed to  
in writing, prior to work being performed, by an 
officer of the company. Damage or deterioration 
due to extraordinary or ordinary wear and tear 
(including, but not limited to, use of equipment 
to handle product of sizes, or weights and shapes 
or  at  speeds  or  methods  which  differ  from 
information  originally  provided  to  Seller), 
chemical  action,  wear  caused  by  abrasive 
materials  or  by  improper  maintenance  and 
lubrication, or by improper storage and handling 
shall not constitute defects. Failure to install or 
assemble  equipment  properly  shall  not 
constitute  defects.  Warranty  does  not  cover 
consumable items. 

 

b)

 

Seller  has  made  no  representation,  warranties, 
or  guarantees,  expressed  or  implied,  not 
expressly  set  forth  on  above  paragraph.  Seller 
shall  not  be  liable  hereunder  for  any 
consequential  damages  included  but  not  in 
limitation, damages which may arise from loss or 
anticipated profits or production from increased 
cost or operation of spoilage material. 

 

c)

 

The  components  used  in  manufacture  of  said 
equipment, which were manufactured by others, 

will  carry  such  manufacturer’

s  customary 

warranty, which Seller will obtain for Buyer upon 
request. 

 

d)

 

No  representative  of  MC3  Manufacturing  has 
been  conferred  with  any  authority  to  waive, 
alter, vary or add to the terms of warranty stated 
herein,  without  prior  authorization  in  writing 
executed by an officer of the company. 

 
 

Note:

  To  protect  warranties  on  any  conveyor 

components (i.e. gearbox, motor, bearings, belt, 

etc.)  call  the  Seller’s  home  office  for 

authorization before disassembling, or replacing. 
Failure  to  do  so  will  immediately  void  all 
warranties. 

 

Содержание CDLR

Страница 1: ...EYOR Operation and Maintenance Manual MC3 Manufacturing Inc 1979 Setterington Drive RR2 Kingsville Ontario N9Y 2E5 Canada Telephone 1 877 726 9990 Fax 519 325 1374 Email info mc3mfg com Home Page www mc3mfg com ...

Страница 2: ...CDLR Conveyor Operation and Maintenance Manual Rev 0 2021 01 26 2 The content of this manual is owned and copyrighted by MC3 Manufacturing Inc ...

Страница 3: ...tion 4 Delivery Inspection 4 Warranty 4 Safety Consideration 5 Installation 6 Operating the Conveyor 6 Roller Care 7 Motors 7 Gear Reducers 7 Bearings 8 Chain and Sprockets 8 General Maintenance 9 Trouble Shooting 10 Trouble Shooting Tips 11 Replacement Parts 12 Parts List 13 Notes 14 ...

Страница 4: ...s only and the Seller will make no allowance for corrective work done unless agreed to in writing by MC3 Manufacturing Charges for correction of defects by others will not be accepted unless agreed to in writing prior to work being performed by an officer of the company Damage or deterioration due to extraordinary or ordinary wear and tear including but not limited to use of equipment to handle pr...

Страница 5: ...s safety shoes and gloves 2 Ensure area around installation site is free of debris 3 Be aware of any sharp edges while handling conveyor components 4 Be careful in and around the conveyor s during installation and be aware of the location of other personnel 5 Only allow qualified personnel to assemble and install the equipment 6 All electrical wiring must be completed by a qualified electrician ac...

Страница 6: ... with the wheel locks if fitted 5 Check the oil level in the gear reducer 6 If your conveyor is supplied with its own control box this now needs to be wired into a suitable electrical supply If your conveyor is supplied without a control box then it will need to be wired into the control system of your machine Note All electrical wiring must be completed by a qualified electrician according to loc...

Страница 7: ...mal operating conditions require no more lubrication Under severe conditions where additional lubrication is required use the following chart as a guide See Fig 1 Condition Lubricating Frequency Normal 8 hr Day Light Loads 2 3 Years Heavy 24 hr Day Heavy 1 Year Loads Dirty Conditions Extreme Shock Loads High 3 6 Months Temperature Typical Lubricants Chevron Oil Co SRI 2 Gulf Refining Co Precision ...

Страница 8: ...ings 1 Lubrication Greasing frequency should be regulated to as many times as necessary to keep a small film of grease leaking at the seals This will protect against foreign materials entering the bearing The following list is provided to aid you in acquiring the correct or an equivalent grease See Fig 3 Normal Duty Heavy Duty Texaco Multifak 2 Sun Prestige 742 EP Mobil Mobilux 2 Exxon Lidok 2 EP ...

Страница 9: ...ys start the conveyor before introducing parts onto the belt 2 After the machine has been used for a long period of time the belt may lose tension due to elongation of the belt If this is the case then adjust the belt tension Impact Conveyor Maintenance Schedule Daily Inspection a Check for abnormal sounds around conveyor b Check for cleanliness c Check that the conveyor is clear before starting M...

Страница 10: ...orrect the root of the problem not just the symptom s This often involves replacing or repairing a part or making adjustments A process or piece of equipment should never be adjusted to compensate for a problem and that action considered finishing the job Correct the problem 4 Verify that the problem has been corrected Repeating the same check that originally indicated the problem can often do thi...

Страница 11: ... Roller Check Weight Limit and load conveyor evenly Drive problems Overload trips Excessive load Reduce load Belt over tensioned Adjust belt tension Drive overheating Low oil level Add oil to correct level Excessive load Reduce load Belt over tensioned Adjust belt tension Abnormal Noises Squealing Rollers or Chain rubbing on guarding Turn off Conveyor and check guarding for any wear Clicking Loose...

Страница 12: ...ting time The general condition of the conveyor should be inspected daily i e at the start or end of a shift and an in depth inspection should be carried out during regularly scheduled maintenance procedures When you need to procure consumable parts contact MC3 Manufacturing Inc at 519 325 1370 quoting the serial number s of the machine s the part names and quantities of each part required Note Pl...

Страница 13: ... 2021 01 26 13 Parts List Item Part Description 1 Roller Roller Chain 2 Roller w Sprocket Attachments 3 Roller to Motor Chain 4 Driving Sprocket 5 Drive Motor 6 Motor to Gearbox Adapter 7 Gearbox 8 Gearbox Shaft Cover 9 Plug in Shaft 10 Controls Optional ...

Страница 14: ...CDLR Conveyor Operation and Maintenance Manual Rev 0 2021 01 26 10 Notes ...

Отзывы: