![MBA Instruments MLA 900 Скачать руководство пользователя страница 12](http://html.mh-extra.com/html/mba-instruments/mla-900/mla-900_operating-instructions-manual_1752521012.webp)
12
MLA 900 Operating Instructions V 2.0 8011381 © MBA Instruments GmbH
Preparing for operation
3.1
Supply schedule
When delivered, the MLA 900 consists of:
●
display unit with ground clamp
●
measuring probe
●
probe cable, 2 m long
●
probe cable, 10 m long
●
transport case
Bild 1
MLA 900 supply schedule
VORSICHT: Risk of damage
●
Tight bending may damage the cable (cable breaks).
●
Damaged cables must not be used in hazardous locations.
b
Never buckle the probe cable and do not bend the cables too far.
b
At temperatures below 0 °C (32 °F), treat the probe cable with particular
care – because the cable sheath may become brittle at these temperatures.
Avoid tight bending (risk of breakage).
●
Keep the transport box even if you do not wish to use it when operating the
MLA 900. It may be useful as a shipping packaging.
●
List of spare parts
Nr.: 930XXX
PTB02ATEX2201X
display unit
measuring
probe
probe cable
2 m
probe cable
10 m
ground clamp
Содержание MLA 900
Страница 4: ...Contents 4 MLA 900 Operating Instructions V2 0 8011381 MBA Instruments GmbH ...
Страница 14: ...14 MLA 900 Operating Instructions V2 0 8011381 MBA Instruments GmbH Preparing for operation ...
Страница 28: ...28 MLA 900 Operating Instructions V2 0 8011381 MBA Instruments GmbH Maintenance Figure 8 Changing the battery ...
Страница 34: ...34 MLA 900 Operating Instructions V2 0 8011381 MBA Instruments GmbH Storage transport ...