13
NOTE:
When the exhaust duct work passes through a wall, ceiling, or roof made of combustible
materials, the opening
must be
2-inches (5.08 cm) larger than the duct (
ALL
the way around).
The duct
must be
centered within this opening.
To protect the outside end of the horizontal duct work from the weather, a 90º elbow bent downward
should
be
installed where the exhaust exits the building. If the exhaust duct work travels vertically up through the
roof, it
should be
protected from the weather by using a 180º turn to point the opening downward. In either
case, allow at least twice the diameter of the duct between the duct opening and nearest obstruction.
IMPORTANT: DO NOT
use screens or caps on the outside opening of the exhaust duct work.
NOTE: In situations where a 10-inch (25.4 cm) exhaust duct is required or acceptable, to ease
installation an 8-inch (20.32 cm) dryer exhaust outlet size to 10-inch (25.4 cm) exhaust
duct increaser (transition piece) is available from the factory by ordering Part No.
882099
.
Содержание MLG32PD3
Страница 39: ...35 PartNo 113158 1 11 03 00 50 ...