12
E. EXHAUST REQUIREMENTS
Exhaust duct work
should be
designed and installed by a qualified professional. Improperly sized duct work will
create excessive back pressure which results in slow drying, increased use of energy, overheating of the dryer,
and shutdown of the burner by the airflow (sail) switches, burner hi-limits, or basket (tumbler) hi-heat thermostats.
CAUTION: IMPROPERLY
SIZED
or
INSTALLED
EXHAUST
DUCT
WORK
CAN
CREATE
A
POTENTIAL
FIRE
HAZARD
.
The exhaust duct work
should be
laid out in such a way that the duct work travels as directly as possible to the
outdoors with as few turns as possible. When single dryer venting is used, the duct work from the dryer to the
outside exhaust outlet
must not exceed
10 feet (3.05 meters). In the case of multiple (common) dryer venting,
the distance from the last dryer to the outside exhaust outlet
must not exceed
20 feet (6.1 meters). The shape
of the exhaust duct work is not critical so long as the minimum cross-sectional area is provided.
1. Single Dryer Venting
Where possible, it is suggested to provide a separate exhaust duct for each dryer. The exhaust duct work
should be
laid out in such a way that the duct work travels as directly as possible to the outdoors with as
few turns as possible. It is suggested that the use of 90º turns in ducting be avoided; use 30º or 45º angles
instead. The shape of the exhaust duct work is not critical so long as the minimum cross-sectional area is
provided.
IMPORTANT:
Exhaust back pressure measured by a manometer at the dryer’s exhaust duct area
must not exceed
0.3 inches of water column (W.C.) - 0.74 mb - when both baskets
(tumblers) are operating.
It is suggested that the duct work from each dryer not exceed 10 feet (3.05 meters) with no more than two
(2) elbows. If the duct work exceeds 10 feet (3.05 meters) or has numerous elbows, the cross-sectional
area of the duct work
must be
increased in proportion to length or number of elbows in it.
IMPORTANT:
For extended duct work runs, the cross-sectional area of the duct work can only be
increased to an extent. Maximum proportional duct work runs
cannot
exceed 10 feet
(3.05 meters) more than the original limitations of 10 feet (3.05 meters) with two (2)
elbows. When the duct work approaches the maximum limits as noted in this manual,
a professional heating, venting, and air-conditioning (HVAC) firm
should be
consulted
for proper venting information.
The duct work
should be
smooth inside with no projections from sheet metal screws or other obstructions,
which will collect lint. When adding ducts, the duct to be added should overlap the duct to which it is to be
connected.
ALL
duct work joints
must be
taped to prevent moisture and lint from escaping into the
building. Also, inspection doors
should be
installed at strategic points in the exhaust duct work for periodic
inspection and cleaning.
Содержание MLG32PD3
Страница 39: ...35 PartNo 113158 1 11 03 00 50 ...