33
SECTION VIII
PROCEDURE FOR FUNCTIONAL CHECK
OF REPLACEMENT COMPONENTS
1. Microprocessor Controller (Computer) Board
a. Phase 7 Coin Models
1) Upon completing installation of the replacement microprocessor controller (computer) board,
reestablish power to the dryer.
2) Start the drying cycle by pressing any temperature selection keys (HI, MED, or LO).
3) Verify that the applicable indicator lights on the microprocessor controller (computer) board are lit.
(Refer to the
illustration
below
.)
Содержание MDG50MNVWW
Страница 19: ...15 HORIZONTAL VENTING Illus C VERTICAL VENTING Illus D...
Страница 48: ...Part No 113308 6 06 26 08 0...