3-3
CHeMiCaL inJeCTiOn
The chemical injection inlets are located in
the top right back corner of the back panel.
These inlets are closed off from the factory.
Inlets must be drilled out before they can be
used. The steam vent is part of the chemical
injection mixing chamber.
The liquid supply connection board is located
behind a cover panel on the back upper
panel. There are 8 ports available for
signals to dispenser pumps. Each port has a
corresponding LED to indicate when the port
is active. Supply signals are 24VAC with a
maximum current of 10mA. The Liquid Supply
harness is routed through the controls tray
and connects to J11 on the ACU.
uSB upDaTe prOCeDure
There are two USB ports available on the
washer. One is located inside the control
panel and a second is on exterior of the upper
back panel. The USB port can be used for
controls software installation and updates or to
upload or download washer set-up to and from
like washer models. Refer to Programming
Guide.
Содержание MYR20
Страница 6: ...vi NOTES ...
Страница 10: ...1 4 Data plate location Data Plate On Back Panel ...
Страница 13: ...2 1 Information specifications Rigid model dimensions ...
Страница 24: ...3 6 NOTES ...
Страница 70: ...4 46 NOTES ...
Страница 73: ...5 3 ACU Door Lock Connections Note that Door Lock and ACU connection pin numbers invert with harness ...
Страница 80: ...6 2 Diagnostic cycle chart ...
Страница 84: ...6 6 NOTES ...
Страница 86: ...7 2 NOTES ...
Страница 88: ......