15
12. Place cords/wires of Front Panel and Back Panel into the sauna room area to avoid
damaging the cords/wires during the roof installation. Open the door, lift the Roof Panel
up and over the sauna room, and gently lower it into place resting it on the wall panels.
Make sure that all cords/wires are slipped through the corresponding holes in the Roof
Panel. Proceed in screwing the Roof Panel down.
See
FIG-12, 13 & 14
.
FIG-13
Slip cords/wires through
FIG-14
Connecting cords/wires connectors
corresponding holes
13. Connect all the wires and connectors to the corresponding outlets on the Roof Panel.
Please be sure all the plugs are connected snug and tight.
See FIG-14.
Next, pull
down the cords/wires of the power plugs of the speakers, temperature sensor, control
panel and CD player through the hole near the fan on the Roof Panel.
14. The CD Player will already be mounted in its wood housing box. Connect the antenna
to the CD player. Next, feed the wires up through the roof. Connect the antenna into
the rear of the radio and connect the radio harness up o the roof.
See
FIG-15
Next,
mount the wood housing box to the ceiling of the sauna room.
FIG-16 and 17.
Note: CD player may not be available on all model sauna rooms
Step 1 Step 2
FIG-15
Screw CD Player into sauna room