3
Table of Contents
Section 1 Specifications .........................................................................................................
5
1.1 Dimensions ......................................................................................................................... 6
Section 2 General Information ................................................................................................
7
2.1 Safety information ................................................................................................................ 7
2.1.1 Use of hazard information ................................................................................................. 7
2.1.2 Precautionary labels ......................................................................................................... 7
2.2 General Information ............................................................................................................. 8
2.2.1 Areas of application .......................................................................................................... 8
2.2.2 Functional description ...................................................................................................... 8
2.3 Product contents .................................................................................................................. 8
Section 3 Installation ...............................................................................................................
11
3.1 Mechanical installation ......................................................................................................... 12
3.1.1 Required tools ................................................................................................................... 12
3.1.2 Installation location (TP5 W) ............................................................................................ 13
3.1.3 Position (TP5 P and TP5 C ............................................................................................... 14
3.1.4 Attach the sampler compartment to the bottle compartment (TP5 P ................................. 15
3.2 Electrical connections .......................................................................................................... 15
3.2.1 Electrical installation ......................................................................................................... 16
3.2.1.1 Prepare the electrical installation ................................................................................... 16
3.2.1.2 Wiring diagram ............................................................................................................... 17
3.2.2 Installation of the optional bottle compartment with active cooling (TP5 P/TP5 C ............. 18
3.3 Commission of the equipment ............................................................................................. 20
3.3.1 Tube connection ............................................................................................................... 20
3.3.2 Set the individual sample volumes .................................................................................... 21
3.3.2.1 Plastic dosing vessel ...................................................................................................... 21
3.3.2.2 Glass dosing vessel ...................................................................................................... 23
3.3.2.3 Dosing vessel for flow-proportional sampling ................................................................ 25
3.3.3 Remove the top part of the housing (TP5 P) .................................................................... 27
3.3.4 Remove the top part of the housing (TP5 C) .................................................................... 28
3.3.5 Prepare the bottle compartments ...................................................................................... 28
3.3.6 Attach the top part of the housing ...................................................................................... 29
3.3.7 Connect the equipment to the mains ................................................................................ 30
3.3.8 Switch on the device ........................................................................................................ 32
3.3.9 Adjust the cooling settings for the optional bottle compartment with active cooling (TP5 P
and
TP5 C ......................................................................................................................................... 33
Section 4 Operation .................................................................................................................
35
4.1 Control unit operation .......................................................................................................... 35
4.1.1 Password ......................................................................................................................... 35
4.1.2 Programming .................................................................................................................... 35
4.1.3 Keyboard layout/function .................................................................................................. 35
4.2 Normal operation ................................................................................................................. 37
4.2.1 Replace the sample bottles ............................................................................................... 37
4
Section 5 Maintenance and cleaning ......................................................................................
39
5.1 Maintenance tasks .............................................................................................................. 39
5.2 Cleaning .............................................................................................................................. 39
5.2.1 Clean the housing and distribution unit (TP5 P–TP5 C ..................................................... 39
5.2.2 Clean the dosing vessel ................................................................................................... 41
Содержание TP5 C
Страница 2: ...Access code for programming and settings Password Your Password 6299...
Страница 9: ...General Information 9 Figure 3 Scope of delivery TP5 P Figure 4 Scope of delivery TP5 C...
Страница 10: ...General Information 10...
Страница 24: ...Installation 24 Figure 24 Remove the glass dosing vessel Figure 25 Cut the dosing tube to set the sample volume...
Страница 34: ...Installation 34...
Страница 38: ...Operation 38...
Страница 42: ...Maintenance and cleaning 42 Figure 47 Remove the dosing vessel Figure 48 Clean the dosing vessel...
Страница 46: ...Maintenance and cleaning 46...
Страница 51: ...Replacement parts and accessories 51 Figure 56 Transportation trolley TP5 P TP5 C...
Страница 52: ...Replacement parts and accessories 52...