Installation
- 31 -
3.3.4 Connect the equipment to the mains
Make sure that:
the equipment has been fully prepared for commissioning
the values on the rating label correspond with those of the
mains supply
the correct plug has been attached or the direct wire has been
implemented correctly
the equipment can be put into operation without any risks.
Figure 40 Rating label
Figure 41 Possible connection configurations
Содержание SP5 A
Страница 2: ...2 Remark Access code for program changes or changes of system settings Password Your password 6299...
Страница 12: ...Installation 12 3 1 2 Select place of installation Figure 5 Select place of installation...
Страница 15: ...Installation 15 Figure 10 Set up the equipment SP5 C SP5 Sxx Figure 11 Set up the equipment SP5 Sxx...
Страница 22: ...Installation 22 Figure 23 Screw in the union nut Figure 24 Close the lid...
Страница 35: ...Operation 35 Figure 45 Remove full bottles Figure 46 Replace with empty bottles...
Страница 48: ...Maintenance and cleaning 48 Figure 67 Clean the dosing vessel Figure 68 Install the dosing vessel...
Страница 49: ...Maintenance and cleaning 49 5 2 2 1 Cleaning measuringtube flow proportional dosing system 1 2 3 4...
Страница 50: ...Maintenance and cleaning 50 5 6 7...
Страница 55: ...Chapter 6 Spare parts and accessories 55 6 1 Spare parts Figure 74 Plastic dosing vessel...
Страница 56: ...Spare parts 56 Figure 75 Glass dosing vessel 350 ml...
Страница 57: ...Ersatzteile 57 Figure 76 Glass dosing vessel 500 ml...
Страница 58: ...Spare parts 58 Figure 77 Glass dosing vessel flow through...