Installation manual
Liftgate GPC 22 X-1, Series 11
Document no.: S 20 912 436
15
Version 2021
Assembly of the lifting gear and the synchronizer bar
WARNING
Installation at crushing and shearing points
Fingers are at risk of being crushed or sheared when the lifting gear is installed on the vehicle.
Be careful at the connecting points between the lifting gear and vehicle.
Install the mounting brackets loose, secure lifting machanism with Bolt clamp, and connect the
positive and ground cables at the battery.
Lift up the Lift arms in order and to assemble the synchronizer bar (see drawings at page 17).
Measure the frame width of the vehicle.
Adjust the
positions of the brackets
to the frame and hand
tighten the bolts
The brackets GPC positioned on the frame width
max. 34“ 2/3 inch
min. 29“ ½ inch
lift the arm
to assembly
the synchronizer
bar
IMPORTANT
after assembly
check and readjust
if necessary.