background image

© Copyright 2019. MaxLite, Inc. All Rights Reserved.
12 York Ave, West Caldwell, NJ 07006   Tel: 800-555-5629   Fax: 973-244-7333   Email: [email protected]

Page: 2
REV: 04/23/19

General Wiring Diagram

CAUTION: 

Turn off electrical power at

fuse or circuit breaker box before wiring
fixture to the power supply.

Connecting panels to AC source supply:
All units must be individually connected to 
the AC supply. 

Black = Line

White = Neutral

Green = Ground

Installation & Operation

1.

Remove the three (3) set screws at the bottom of   
the fixture and remove the base plate (see 

Fig. 1

).

2.

Place the anchor bolt assembly (three (3) anchor bolts 
secured to the pad plate with nuts on either side) over the   
conduit and secure for the concrete pour. Ensure that the 
pad plate is flush with the concrete surface, and that the 
assembly will not dislodge during the concrete pour (see 

Fig. 2

).

3.

Pour concrete while ensuring that the pad plate is as level   
as possible. Allow the concrete to cure. 

4.

Once the concrete is dry, place the base plate onto the
anchor bolts and secure it with nuts and washers (see 

Fig. 3

). 

5.

Connect the power supply wires from the conduit to the  
input wires from the bottom of the fixture according to the  
wiring diagram. 

6.

Mount the fixture on the base and secure it with the  
three (3) set screws removed from the bottom of the 
fixture in step 1. 

(+) LINE

(-) COMMON

GROUND

GREEN

WHITE

BLACK

Light

Fixture

Base

Set Screw

Anchor Bolt

Conduit

Pad Plate

Base

Nut

Washer

Operating Instructions     

LED Bollard -  BL-CL2RD Series                                                                                                               

MaxLite

Classic Round Bollard  42” Dome Top

®

Отзывы: