background image

MAX POWER 

LOCATION OF THE AUXILIARY EQUIPMENT 

 
The transmission lube oil tank and the hydraulic directional valve should be located 
near the RETRACT unit, but in an accessible and dry place.  
 
The hydraulic oil reservoir must be located above the water line, above and as near 
to the pump as possible there must be now sharp elbows between the pump and the 
oil tank.  
 
The control panel (s) joystick (s), or foot switches are to be installed as required at 
helm stations. The remote control box is to be installed in a convenient dry and well-
ventilated position.  
 
 

INSTALLATION OF THE RETRACT UNIT 

 
 

CONSTRUCTION OF THE MOUNTING BASE 

 
MAX POWER can supply as an option, a G.R.P. laminated mounting base, 
aluminium alloy machined mounting-flange. These options allow you to save 
considerable installation time, and assure precise installation.  
 
The general method and materials used must be adapted to the particular hull 
material (laminated wood, GRP, sandwich, aluminium, or steel). Naval Architects, 
Classification Societies or engineering firms should be consulted.  
 

GUIDE BLOCKS 

 

The thruster’s mechanical stresses are spread over the hull by the mounting base 
and the guide blocks. Installation, which should be executed by welding or bonding to 
the hulls plating, normally reinforces the hull, The mounting base should be attached 
to frames and stringers as well. The guide blocks should be replaceable should they 
be found worn at a later date. 
 
After the mounting base has been made, the RETRACT should be temporarily 
secured on the flange to check its height its, centring,  the accessibility of fittings and 
the ease of operation of manual up down override system.  
Another important reason for this is to determine the exact location of the two plastic 
guide blocks. 
These blocks are to be fabricated by the installer from a suitable plastic (PEHD type 
etc) incompressible with 0 % moisture absorption. 
The guide blocks distribute the thrust forces to the hull. They should be fixed to the 
interior of the mounting base so that they will be directly in contact with the  folding 
arm pivots when the turbine is fully extended (See building plan) . 
 

GRP HULLS

: The mounting base may be moulded into the hull during construction 

or prefabricated, and then laminated onto the hull later.  
 

 

- 5                  INSTALLATION MANUAL RETRACT  R 450                    

 

Содержание RETRACT R450 Series

Страница 1: ..._ __ __ __ __ __ _ B BU UI IL LT T B BY Y _ __ __ __ __ __ __ __ __ __ __ __ __ __ __ __ _ D DE EL LI IV VE ER RE ED D _ __ __ __ __ __ __ __ __ __ _ A copy of this manual must remain on board for con...

Страница 2: ...FITTING OF THE RETRACT UNIT TO THE MOUNTING BASE P7 FINAL ADJUSTING OF THE CLOSING PLATE P8 RAISE LOWER POWER PACK INSTALLATION P8 TRANSMISSION LUBE OIL TANK INSTALLATION P9 HYDRAULIC POWER SYSTEM INS...

Страница 3: ...formance and feasibility This study covers 3 distinct sub systems 1 The RETRACT thruster unit positioning space available structural compatibility etc 2 Hydraulic equipment positioning equipment power...

Страница 4: ...ERMINING BEST EQUIPMENT LOCATION POSITIONING OF THE RETRACT UNIT IMPORTANT Correct positioning is essential for correct operation See drawing 1 The turbines centre requires to be 675 mm 26 below the w...

Страница 5: ...GUIDE BLOCKS The thruster s mechanical stresses are spread over the hull by the mounting base and the guide blocks Installation which should be executed by welding or bonding to the hulls plating nor...

Страница 6: ...s closing plate should bear against a gasket fixed to a 20 mm wide rebate when in the raised position While the hull opening closing plate is being fabricated the RETRACT must be temporarily secured o...

Страница 7: ...th the hydraulic pipe plugs for storage and future use by the ships crew FINAL ADJUSTING OF THE CLOSING PLATE See drawings N 4 N 3 Once the thruster is permanently bolted onto the mounting base reinst...

Страница 8: ...of electrical earth leakage s the hydraulic hoses connected directly to the RETRACT should be non conductive non metal braided hose high pressure thermoplastic hose Absolute internal cleanliness is e...

Страница 9: ...uality that is not subject to pinching or crimping This hose should preferably be shorter than 2 meters and have no 90 degree elbows bends CAUTION to prevent the risk of electrical earth leakage s the...

Страница 10: ...d on our diagrams must be connected 1 to 1 and 2 to 2 wire sections must be respected to the letter The control box command s the up down unit and hydraulic power spool valves in the correct sequence...

Страница 11: ...Check all fittings for tightness and leaks The transmission is already filled with oil at the time of delivery Max Power uses HYPIOD HD 80W 90 oil in the transmission therefore fill the transmission l...

Страница 12: ...l the joystick towards yourself aft or down the red light will extinguish the alarm buzzer will sound until the green light illuminates The unit is ready for use when the green light is lit and the bu...

Страница 13: ...he green B position switch by loosening its securing nut and readjusting it closer to the actuator PROBLEM The thruster seems to be developing less thrust SECONDARY CAUSE Low oil pressure REMEDY Check...

Страница 14: ...move the top cover plate and clean the interior of the caisson and rinse well the articulated joints IMPORTANT If the vessel will remain out of the water for some time for example dry storage for the...

Страница 15: ...nd replace filters 5 YEARS 1 Complete removal of unit and return to factory Replacement of all submerged flexible hoses Replace all oil seals and check for bearing wear Unit striped and re corrosion t...

Страница 16: ...MAX POWER PROJECT MANAGER S TEST RESULTS FORM To be filled out and faxed to MAX POWER 16 INSTALLATION MANUAL RETRACT R 450...

Страница 17: ...ith the bottom of the hull 2 Is there enough room for general maintenance of the RETRACT and its auxiliary equipment 3 Does the closing plate rest upon a gasket 4 Is the adjustment of the closing plat...

Страница 18: ...engine s running and the thruster running either direction 1 Record the voltage at the remote control box Volts 2 Record the hydraulic pressure slow speed Bars 3 Record the hydraulic pressure full sp...

Страница 19: ...nimum immersion depth of one full turbine diameter should be respected and the thrusters should be as far forward or aft as possible The thruster must be paralell with the botom of the hull not the wa...

Страница 20: ...etract Thruster Construction point Never changes nomater the hull shape 17 4 00 RETRACT R450 PRINCIPAL DIMENTIONS YT Turbo CAD The Thruster should be mounted paralell with the botom of the hull Flexab...

Страница 21: ...NO REVISION 3RD ANGLE PROJECTION Construction point errors Max Power 03 05 01 POWER Thruster mounted to high Will cause low performance and more loss of boyancy Thruster mounted corectly Thruster mou...

Страница 22: ...Fig 1 Fig 2 Gap Caution this situation would cause damage to the turbine while at sea This gap is essential it should be of at least 5mm In this situation there is still up wards movement possible A R...

Страница 23: ...fting arm Thruster up and locked Thruster unlocking Ram spring compresed Ram pulling Thruster down Bolt puled out of lifting arms lock R450 locking system Ram pulling Gas spring on other side pushing...

Страница 24: ...ts thread at point H Failure to do this can result in serious damage to the turbine 1 1 A B 2 H Proximity switches 1 The proximity switches on the thruster indicate to the control box in witch positio...

Страница 25: ...OFF Yachts main equipment breaker bord 4 x 2 mm 2 x 1 mm N 17 18 As shown auxilary alarms N 31 32 Prime mover N 1 8 9 11 DCV valve can also control power if LS N N 21 22 Up Down pump Motor N 1 5 6 Up...

Страница 26: ...bypass status port 11 and any 24v neg Switch bar C10 The more bars are on the longer the time delay before port 31 32 energisie Switch bar C11 The more bars are on the longer the delay before port 11...

Страница 27: ...UMP SUPPLY POS UP DOWN PUMP SUPPLY NEG NEG 12v 24v POSITION DETECTOR SWITCHES ARE N O TO CONTROL PANEL S ON OFF 24v NEG SUPPLY TO CONTROLE SYSTEM POS SUPPLY TO CONTROLE SYSTEM _ _ _ NEG Plan for custo...

Страница 28: ...r is down and ready to function Service closing plate fixations POWER Hull plate bracket to be made in such a way as no contact is made between hull plate and thruster To change oil remove both Plugs...

Отзывы: