GENERAL

As mentioned in the section dedicated to protections, 

the command and control board controls the smooth 

operation of the compressor. 

It is possible that, due to the incorrect use of the 

machine, or incorrect maintenance or unforeseen 

conditions, etc., malfunctions occur and that only their 

effects are indicated. 

The table below aims at helping the operator solve 

some difficulties should they arise while indicating their 

possible causes. 

pRObLEM - CAUSE - SOLUTION

Below some possible failures are indicated with their 

causes and how to identify the correct solution.

PROBLEM 

CAUSE

SOLUTION

A. Start

Maestro

XB

 works, start is allowed 

but the star/triangle admission 

commutation or start Inverter does 

not take function correctly.

The power supply line is insufficient 

and the excessive drop of voltage 

following the start provokes the 

contactors or the Inverter safety relay 

(

version) to be released.

Check for the correct size of the supply 

line. Please refer to the

 “Installation, 

Use and Maintenance Manual” 

in 

Section 5.

 

Contact the nearest 

authorized service center.

Maestro

XB

 works, it enables the start, 

but the compressor does not start.

Pressure inside the compressor is 

higher than the maximum tolerated 

value for the start: or for an abnormal 

return of the network air, or because 

the pressure transducer reads an 

incorrect value.

Check the inner pressure on the 

pressure gauge of the separator and 

compare it with the value given by 

Maestro

XB

. Verify the correct operation 

of the pressure detection system: 

transducer, collector and switching 

solenoid valves. Contact the nearest 

authorized service center. 

The hour programming has been 

enabled.
The compressor runs within a network 

with other compressors.

B. Pressure 

The network pressure does not reach 

the required value. 

The servo valve has not been correctly 

gauged. 

Verify the setting. Contact the nearest 

authorized service center.

The unload solenoid valve is blocked 

in the open position.

Replace the solenoid valve. Contact 
the nearest authorized service center.

The minimum pressure valve does not 

function correctly.

Verify the operation. 
Contact the nearest authorized service 
center.

Suction filter clogged. 

Replace the filter. Please refer to the 

“Installation, Use and Maintenance 

Manual”

, Section 9.

Request for air greater than the 

compressor maximum capacity.

Please refer to the Sales Organization 

of Ing. Enea Mattei S.p.A. to study 

equipment improvement.

The inner pressure exceeds the set 

value. 

The servo valve has not been gauged 

correctly and/or the setting of the 

maximum pressure value in the [USER 

MENU] menu is incorrect.

Verify both the servo valve and 

the correct setting of operating 

parameters. Please refer to the 

“Installation, Use and Maintenance 

Manual”

, Section 6 and 8.

Содержание BLADE - Plus 15 H

Страница 1: ...INSTRUCTION USE AND MAINTENANCE MANUAL Models BLADE 15 18 22 BLADE 15 18 22 i Versions Standard Plus ENGLISH BLADE Translation of the original instructions in ITALIAN TI215G0010 rif TDA0150017...

Страница 2: ...or disclosed to third parties without the explicit written consent of Ing ENEA MATTEI S p A Ing ENEA MATTEI S p A reserves the right to modify the characteristics of the machine subject of this docum...

Страница 3: ...re parts 1 7 General Information Safety 2 1 Danger and residual risks 2 1 Responsibility 2 3 Description of pictograms 2 3 Description of the machine 3 1 General description of the machine 3 1 Technic...

Страница 4: ...lter element 9 4 Replacement of the elastic element 9 5 Lubricants 10 1 Oil change 10 1 Warning 10 2 General 10 2 Mattei lubricants 10 2 Safety precautions 10 3 Storage and treatment of oils 10 3 Trou...

Страница 5: ...BLADE V TI215G0010 Attachments 15 1 Form to request technical service 15 1 Form to request spare parts 15 2 Technical data sheets 15 3 General index...

Страница 6: ...his information has no direct relationship with the description of a function or with procedure development They could be cross references to other documents or other sections of this manual The table...

Страница 7: ...NEA MATTEI S p A releases the manufacturer from any responsibility whatsoever This manual is for the user and the service engineer of the machine and it aims at supplying them with the basic technical...

Страница 8: ...r in charge of our machines a specialization course is held to train the operator to be able to perform all of the actions necessary to operate the machine even with some of the protections disconnect...

Страница 9: ...he CE MARKING Model Code Serial number Year of manufacture Delivery Pressure Power Number of runs Dryer Tank capacity Total weight Name and address of manufacturer The CE MARKING plate has been applie...

Страница 10: ...DIRECTIVE OF THE EUROPEAN PARLIAMENT AND COUNCIL dated 17 May 2006 Machine Machine means the functional assembly composed of control unit processing unit working and resting equipment systems electric...

Страница 11: ...machine carry out the following operations carefully read the technical documents collect information on the operation and the position of emergency stop devices on the machine know which guards and s...

Страница 12: ...rk such as the laying of foundations or canalizations if required etc anti slip leveled flooring preparation of both the place of installation and the machine installation itself whilst observing the...

Страница 13: ...ipment under voltage in the event that the metallic container is open protection of the electrical cabin IP 54 protection of inner equipment IP 20 against accidental contact Adequate panels or protect...

Страница 14: ...anceregister supplied with the machine Duly trained staff should carry out maintenance only with the compressor off and after ensuring that no more pressure exists inside it Also insulate the compress...

Страница 15: ...or intervention use of non original spare parts or not explicitly for the model non observance even if only partial of the instructions possible inefficiency caused by the non use or the malfunction o...

Страница 16: ...on a blue background and the symbol in white Obligation to read the Instruction Manual before carrying out any operation on the machine Obligation to use individual protective means against noise PICT...

Страница 17: ...esigned for a continuous industrial service they guarantee constant performance over time low energy consumptions reliability functionality and easy maintenance The electro compressor comes complete w...

Страница 18: ...hite metal bearings having a practicallyunlimitedlifetime Theairdrawninfirstpasses through a filter and then through the modulating valve The decrease in volume of the pockets formed by the stator rot...

Страница 19: ...h adapts compressor operation to the specific require ments of the air line it is connected to It features various programming levels and performs operating and fault controls and analysis Advanced pr...

Страница 20: ...vated compressor optional running compressor optional compressor under load optional compressor blocked standard Communication MAESTROxB ensures remote monitoring through MODBUS protocol WARNING The c...

Страница 21: ...chine includes a dryer with a refrigerator cycle that guarantees an adequate compressed air quality The design of the compressor allows for integrating a dryer with refrigerator cycle directly install...

Страница 22: ...mperature rises again above T Start the dryer compressor is re started and the fault warning is automatically turned off Should the dew point temperature rise above the upper limit the controller will...

Страница 23: ...tor 9 Electric starter 10 Oil filler plug 11 Oil drain cock 12 Intake pre filter 13 Water IN OUT connections for the heat recovery 14 Condensate drain connection for the dryer 15 MaestroXB 16 Dryer 17...

Страница 24: ...22 Plus R VERSION BLADE 15 18 22 i Plus R VERSION BLADE BLADE i BASE PLUS 575 635 595 655 590 650 610 670 600 660 620 680 0 112 5 95 D 3 D1 3 INGRESSO ACQUA WATER INLET USCITA ACQUA WATER OUTLET G 1 2...

Страница 25: ...ic pictrograms indicate the lifting points The centre of gravity is near the coupling between motor and compressor before lifting check lift the unit from the ground just slightly that lifting points...

Страница 26: ...t 85 the absorbed power For the BLADE 15 22 Series machines having the cooling air outlet on the canopy top panel the distance from the ceiling should not be lower than 1 5 meters If such a clearance...

Страница 27: ...ed air from the machine to the end users with the lowest pressure drop and energy waste To avoid losses and wastes regularly check all pipings of the distribution equipment and all accessories Filters...

Страница 28: ...e 1 gives the load losses over 100 metres straight piping according to nominal diameters usually employed and at different air delivery and working pressure conditions A perfect air distribution syste...

Страница 29: ...the load loss at approximately 20 Pa If the duct offers greater resistance an auxiliary extractor should be used to prevent any overheating of the machine As an example a duct with a higher or equal...

Страница 30: ...sure control perfomed by MAESTROXB compressors of BLADE 15 22 Series keep the modulation and off load functions by means of a servovalve Thisservovalvelimitsthemaximumoperating pressure during the CON...

Страница 31: ...cur It is possible to set an OPTIONAL weekly programming keypad The buttons are backlit for enhanced clarity and in some cases in order to complete the information provided by the device Key ON OFF To...

Страница 32: ...compressed air system operation modes BLADE VERSION To meet the users requirements Mattei compressors have been designed to work in three main operating modes Continuous Automatic and Modulation The...

Страница 33: ...s it starts again as soon as line pressure falls below Pmin 2 if line pressure falls to Pmin before TMV expires the compressor is recharged The above operating mode can be combined with a special char...

Страница 34: ...ing machine capacity to line requirements Maximum pressure and values slightly below this define a field or range which is known as a MODULATION BAND This operating mode exploits this potential The co...

Страница 35: ...no load condition has been reached and the no load run time is terminated the compressor only stops if the oil temperature exceeds the value set The line pressure is controlled in order to prevent it...

Страница 36: ...mming After the motor has stopped the residual pressure inside the compressor discharges completely in approximately one minute The following page shall be displayed The machine can be started accordi...

Страница 37: ...l or grease with a cloth Sometimes an excess or a lack of lubricant may jeopardize the machine operation Only recommended lubricants or well know and tested equivalent lubricants should be used for lu...

Страница 38: ...month Clean the oil radiator month Clean the air radiator month Clean the intake pre filter month Rotoroil F2 oil change 2 years For other lubricant refer to Section 10 WARNING In dusty environments...

Страница 39: ...s in the due times will meet the expected safety and correct operation requirements The extended warranty contracts impose use of the mentioned kits and ensure that any of the critical parts is replac...

Страница 40: ...the machine body cleaning the pre filter The machine is equipped with a pre filter to remove dust and is articulated by the inflow of air It glides on metallic guides in the rear door and should be wi...

Страница 41: ...ntage of the gap created by the sliding Remove the two halves through the holes in the coupling assembly and replace the old elastic element In this phase it is also possible to easily replace the oil...

Страница 42: ...ntion to the possible presence of foam If necessary wait for some minutes for the oil to demulsify 1 Open the drain plug Pict 2 and drain the oil into a suitable container 2 Lastly close the cock It i...

Страница 43: ...nce overalls eyeglasses or as far as allowed by the safety rules protection gloves or apply a protective product Clean dirty skin carefully by abundantly washing it with water and soap Apply a skin cr...

Страница 44: ...ING It is felt that to prevent fire risks the best attention should be given to the selection of oil and the execution of maintenance operations specifically by carrying out regular and complete oil c...

Страница 45: ...eturn of the network air or because the pressure transducer reads an incorrect value Check the inner pressure on the pressure gauge of the separator and compare it with the value given by MaestroXB Ve...

Страница 46: ...thin the network The air oil separator filter is clogged Replace filter and verify the causes of the clogging see Section 9 D Temperature The compressor stops due to its own over heating The radiator...

Страница 47: ...oes not form on this cover as it could reduce the cooling air passage abnormal noises Any vibration or abnormal noise is usually due to deterioration of the bearings In this case it is recommended to...

Страница 48: ...antling Once the machine has reached the end of its technical and operating life it can be demolished i e decommissioned and put in such a condition so as not to be used any longer for the purposes it...

Страница 49: ...ection and remove the drain solenoid valve Withdraw the solenoid valve filter using beak pliers remove any dirt and wash with detergent Re assemble in the reverse order while paying special attention...

Страница 50: ...o Italy Tel 39 02 253051 Ric Aut Fax 39 0225305243 e mail customer_support mattei it Company Address Please note our request for intervention for our machine Modell Serial number Intervention to be ca...

Страница 51: ...riore 307 20090 Vimodrone Milano Italy Tel 39 02253051 Ric Aut Fax 39 0225305243 e mail spares mattei it Company Address Please note our order no of with required delivery on for our machine Modell Se...

Страница 52: ...er mg m3 3 Total heat recovery 95 Oil circuit capacity dm3 12 Minimum supply cables section 10 mt mm2 10 16 Nominal absorbed current A 32 37 3 40 6 DRYER Absorbed power kW 0 75 Voltage Frequency Phase...

Страница 53: ...Total heat recovery 95 Oil circuit capacity dm3 12 Minimum supply cables section 10 mt mm2 10 16 Nominal absorbed current A 30 8 34 6 40 8 DRYER Absorbed power kW 0 75 Voltage Frequency Phases V Hz P...

Страница 54: ...3 Total heat recovery 95 Oil circuit capacity dm3 12 Minimum supply cables section 10 mt mm2 10 16 Nominal absorbed current A 32 1 36 2 37 2 DRYER Absorbed power kW 0 75 Voltage Frequency Phases V Hz...

Страница 55: ...l carry over mg m3 3 Total heat recovery 95 Oil circuit capacity dm3 12 Minimum supply cables section 10 mt mm2 10 16 Nominal absorbed current A 27 2 30 5 33 8 DRYER Absorbed power kW 0 75 Voltage Fre...

Страница 56: ...Tel 39 02253051 Fax 39 0225305243 E mail info mattei it www matteigroup com Plus manuels disponibles ici FR http tinyurl com BLADE 15 22 F Mehr Anleitungen finden Sie her DE http tinyurl com BLADE 15...

Отзывы: