Single Phase EV Charger Protection unit
10 |
P a g e
Connect the supply cable from the distribution board (or meter tails) directly to the RCBO ‘Incoming Supply’
terminals.
Connect the outgoing cable to the contactor L, E & N terminals.
If required, connect the CT to the 3 pin connector on the PCB
Check ALL power and earth connections before switching on.
THIS PRODUCT IS DESIGNED FOR AN ISOLATED EARTHING ARRANGEMENT. CHECK
BEFORE USING SWA CABLE
Содержание IP-EVCP-M
Страница 5: ...Single Phase EV Charger Protection unit 5 P a g e...
Страница 6: ...Single Phase EV Charger Protection unit 6 P a g e...
Страница 7: ...Single Phase EV Charger Protection unit 7 P a g e...
Страница 13: ...Single Phase EV Charger Protection unit 13 P a g e Connection details for CT versions...