23
STEP 3
| PREMIUM KIT ASSEMBLY INSTRUCTIONS & NOTES
PART 8: PREMIUM KIT ASSEMBLY
1. Remove and discard hole caps using caution not
to scratch the paint.
2. Attach plug to Rep Counter.
3. Assemble Towel Hook (3P) and Rep Counter
(2P) using the M8 X 35L SHC bolts provided.
4. Torque bolts to 17 N-m/147 in-lbs.
Rep Counter wires must be
routed through the center of
the Towel Hook
Rep Counter
ASSEMBLY
Содержание VS-S70
Страница 1: ...OWNERS MANUAL Versa Single Station Strength VS S70 Leg Press ...
Страница 7: ...7 MARKINGS WARNING LABEL LOCATIONS ...
Страница 26: ......
Страница 27: ......