16
ASSEMBLY
STEP 4
| USER FRAME CABLE ASSEMBLY INSTRUCTIONS & NOTES
PART 3: CABLE ASSEMBLY
29
28
26
27
25
ID
DESCRIPTION
QUANTITY
25
M8 X 50L SHC
2
26
Spacer
4
27
Cable Tie Rod End
2
28
M8 Flat Washer
4
29
M8 Nylock Nut
2
*Note: Image shows left arm assembly only, though quantities reflect both left and right arm assemblies.
Fully thread cable bolt into tie-rod, then attach to frame.
Torque item 31 to: 39 N-m/29 ft-lbs.