53
9.10 PeDAl RePlACeMeNT
CHAPTeR 9: PART RePlACeMeNT gUIDe
1) Use a 15 mm wrench commercial pedal wrench (available from Matrix - part # ZMS4001254) to remove the pedal from the crank (Figure A).
note:
For the right side pedal, the threads are normal. For the left side pedal, the threads are reversed (the pedal turns off counterclockwise).
2) Remove the pedal (Figure B).
3) Reverse Steps 1-2 to install a new pedal.
note:
Be sure to tighten the pedal onto the crank using a commercial pedal wrench. The pedal
should be torqued as much as possible using the pedal wrench.
fIgURe A
fIgURe B
Содержание U7xe-04
Страница 1: ...U 7 x e 0 4 B I K E S E R V I C E M A N U A l...
Страница 27: ...24 8 1 Electrical Diagrams Chapter 8 Troubleshooting...
Страница 28: ...25 Chapter 8 Troubleshooting 8 1 Electrical Diagrams CONTINUED...
Страница 29: ...26 8 1 electrical diagramS CONTINUED Pulse Sensor Wire Chapter 8 Troubleshooting POWER RESISTANCE WIRE...
Страница 30: ...27 Digital Communication Wire 8 1 electrical diagramS CONTINUED Chapter 8 Troubleshooting ECB Wire...
Страница 32: ...29 Chapter 8 Troubleshooting 8 3 LCB1_ErP wiring connection...
Страница 72: ...69 10 3 Assembly Instructions Continued step 3 step 4 Chapter 10 bike specifications and assembly guide...
Страница 73: ...70 10 3 ASSEMBLY INSTRUCTIONS CONTINUED Step 5 Chapter 10 bike specifications and assembly guide...
Страница 74: ...71 final assembly 10 3 assembly instructions continued Chapter 10 bike specifications and assembly guide...
Страница 80: ...77 NOTES...