
Installation
Page 12
3.2.9.
Fill the gearbox with gear oil up to the oil fill plug. The types of oil that can be used
are in section 5.2.5.
Fig. 14 Gearbox oil fill plug
3.2.10.
Mount the switch-on electronics on the cover plate of the universal joint shaft and
fasten the sheet metal instead of the battery holder on the tractor.
F
ig.15 Cable with switch-on electronics
Fig. 16 Switch-on electronics on the universal joint shaft cover
3.2.11.
Connect the extension cable to the plug connection on the switch-on electronics.