background image

052-03 - Gas pasta cooker

8

Checking the pilot light

When correctly adjusted, the pilot light flame will com-
pletely surround the thermocouple and will not flicker.

Checking the primary air 

The appliance can be adjusted. Air volume flow is cor-
rect when there is sufficient protection against the fla-
me rising when the burner is cold or light-back when it
is hot. Position the ring at measurement “A” (Fig. 1) in-
dicated in table 1 for type of gas.

Checking the functions 

- Start the appliance in accordance with the instructions; 
- Check the gas tubes for leaks;
- Check that the flame on the main burner lights 

properly and is correctly formed, even on low; 

- Check that the pilot light is correctly regulated; 
- Draw up a servicing and maintenance contract. 

Note for the installer 

- Explain and demonstrate to the user how the machi-

ne works according to the instructions, and hand him
this manual. 

- Remind the user that any structural alterations to the

room housing the appliance may affect the combu-
stion air supply. Once the alterations have been com-
pleted, the appliance and its functions should be tho-
roughly checked. 

Running the appliance on other types
of gas 

When changing to another type of gas, e.g. from natural
to LP, or to another gas group, consult the “TECHNICAL
DATA” table to determine the correct nozzles to use. 
The nozzles for the main burners and pilot light for diffe-
rent types of gas, marked in 100ths of mm, are in a ca-
se supplied with the appliance. 
When the appliance has been transformed or adapted,
r e c h e c k   i t s   f u n c t i o n s   a s   d e s c r i b e d   i n   p a r a g r a p h
"Checking the functions". 

Main burner injector replacement 
(Fig. 1)

To replace the injector (30) dismount the front panel.
Dismount the holding injector collector unscrewing the nut
31 and the nut 32 on the gas cock. With a 12 spanner un-
screw the holding injector and replace them with new one
(see schedule “technical data”). Reassemble in the rever-
se order.

Pilot injector replacement (Fig. 2) 

To replace the pilot injector (36) dismantle the front panel
with a screwdriver and unscrew the screw nut (35), now the
injector can be reached inside the body pilot, replace it
with a new one (see technical data) when finished screw
again the screw nut (35).

Adjusting the low flame (Fig. 3) 

Referring to the “TECHNICAL DATA” table, set the low fla-
me screw (2) as follows: 
- if the appliance is to run on LP gas, tighten the low flame

screw as far as it will go; 

- if the appliance is to run on natural gas, turn the low fla-

me screw while simultaneously adjusting the primary air: 

- read off the setting in It/min which corresponds to the

heat value (calculated by the “Volumetric Method”) in
the Gas Flow Setting Table (2); start the appliance up
according to the instructions;

- after allowing the appliance to run for same mins., turn

the knob to low and set minimum gas flow by turning
screw (2) (to the right = gas flow decreases; to the left =
gas flow increases). 

MAINTENANCE 

The following maintenance programme should be carried
out at least once a year: 
- Check that all the safety and setting devices are working

properly; 

- Check that the burners are working properly with regard

to: 

- ignition 
- combustion safety;
- Check the functions of the appliance as described in pa-

ragraph "Checking the functions".

Содержание ABE0001

Страница 1: ...052_03 Installation operating and maintenance instructions GAS PASTA COOKER 03 2006 ABE0001 ACE0005...

Страница 2: ...ons 8 Note for the installer 8 Running the appliance on other types of gas page 8 Replacing the main burner nozzle 8 Pilot injector replacement 8 Adjusting the low flame 8 Maintenance 8 Replacing part...

Страница 3: ...Gas control knob Piezo electric lighter Water inlet Gas connection Models and dimensions 55 21 600 400 E F 55 655 300 B D A C F 55 21 600 400 E F 55 700 300 B D A C F ABE00001 600 x 650 x 300 weight...

Страница 4: ...ar 30 30 II2H3 P mbar 28 37 20 I3B P P mbar 30 30 I3 P mbar 28 37 SE FI DK CZ SK SI IT CH PT ES IE GB GR NL DE FR BE AT CH LU EE LV LT EE LV LT NO MT CY IS HU CY MOD MOD ART N N Qn kW m3 h MADE IN ITA...

Страница 5: ...l power Connection pressure Methane gas 2H Liquid gas 3 Gas connection values Methane gas 2H Liquid gas 3 Nozzles 1 100 mm Main burner G20 G30 G31 HuB 9 45 kWh m3 m3 h HuB 12 87 kWh kg kg h Nominal ca...

Страница 6: ...quisites During assembly the following legal and technical re quisites should be adhered to relevant national legislation local building and fire safety regulations worksheet Technical rules for insta...

Страница 7: ...Flow Regulation table If you wish to check the nominal capacity further you may do so using a gas meter according to the so called volumetric method It is normally enough however simply to check that...

Страница 8: ...pted recheck its functions as described in paragraph Checking the functions Main burner injector replacement Fig 1 To replace the injector 30 dismount the front panel Dismount the holding injector col...

Страница 9: ...tion lead loosen the lock nut and insert a new plug Gas tap Fig 3 Loosen the gas piping and thermocouple hoses then loosen the screws fixing the gas supply to the gas ramp and insert a new tap Thermoc...

Страница 10: ...nob to the right until it is on high or else continue until it reaches low the heating capacity must be set between these two positions TURNING THE APPLIANCE OFF Turning the appliance off during norma...

Страница 11: ...e of fibrous synthetic material rubbing in the direction of the satin finish Rinse and dry thoroughly Never use wire wool for cleaning stainless steel or leave it in contact with the steel as very sma...

Страница 12: ...DUE TO ITS POLICY OF CONTINUAL PRODUCT IMPRO VEMENT THE MANUFACTURER RESERVES THE RIGHT TO MAKE ANY CHANGES DEEMED NECESSARY THE MANUFACTURER CANNOT BE HELD RESPONSI BLE IF THE INSTRUCTIONS CONTAINED...

Отзывы: