background image

Entrée Bath Gen III

 

INSTALLATION MANUAL 

  
 
 
 
 

01-27-2022 
Page 8 of 9

 

450 East 32

nd

 Street PO Box 1022 (68026) 

Fremont NE 68025 
800-798-5867  Office: 402-564-5867   FAX: 402-563-9102 
www.mastercarebath.com

 

 

13.

 

Tighten the hose clamps on the rubber couplers.  

14.

 

Anchor the tub to a concrete section or to a stud floor. 

15.

 

Proceed to the Operation Manual 

16.

 

Go through a bath cycle and verify all functions work correctly.  

17.

 

Make sure that when the fill knob is in the hot position, hot water 
comes out of the valve. 

Check the water temperature and verify it is 

in  the  proper  range.  Rotate  the  knob  to  mid  range  and  verify  the 
temperature "tracks the knob" and reduces accordingly.  

Note: If the hoses are connected backwards, the mixing valve will not 
function correctly.  

18.

 

Check the GFCI

, located at the Service End under the Electrical Service 

Door, and make sure it trips and resets properly.  

19.

 

Make sure the tub is grounded according to code.  

 

Shower Knob 

Mixing Valve 

GFCI 

Located at the 

Service End 

under the 

Service Door  

Содержание Gen III Entree Bath

Страница 1: ...ollow All Instructions Thoroughly Important safety instructions Read and follow all instructions thoroughly CAUTION The caution heading identifies important maintenance and operation information Failu...

Страница 2: ...Entr e Bath Gen III INSTALLATION MANUAL 01 27 2022 Page 2 of 9 450 East 32nd Street PO Box 1022 68026 Fremont NE 68025 800 798 5867 Office 402 564 5867 FAX 402 563 9102 www mastercarebath com...

Страница 3: ...025 800 798 5867 Office 402 564 5867 FAX 402 563 9102 www mastercarebath com BEFORE STARTING TOOLS NEEDED FOR INSTALLATION Adjustable Wrench Tape Measure Channel Locks Deep and 9 16 Deep Socket and Ra...

Страница 4: ...102 www mastercarebath com ENTR E GEN 2 5 LOCATION REFERENCE v Console Service Access Chair Foot End Controls TOP VIEW OF TUB Back of the Top Front of the Top v High Quality and Wood Stud Floor or Con...

Страница 5: ...he ten 10 lag screws from the bottom of the crate Detail 1 3 Two people will now be required to lift the crate over the top of the Entree Bath 4 Set aside the Entree Gen III Starter Kit box and the Co...

Страница 6: ...b is installed and ready for its test operation Check again to make sure the door is not fully closed and compressing the seal 4 Connect the electrical service to the tub The tub comes with a cord wit...

Страница 7: ...id out for service B Wall Drain Option A Floor Drain Option 40 1 2 Rear Wall Casual Water Drain Hose 19 SIDE VIEW OF DRAIN CAUTION Plumbing and electrical installations must be clear of the full rotat...

Страница 8: ...ctly 17 Make sure that when the fill knob is in the hot position hot water comes out of the valve Check the water temperature and verify it is in the proper range Rotate the knob to mid range and veri...

Страница 9: ...of 9 450 East 32nd Street PO Box 1022 68026 Fremont NE 68025 800 798 5867 Office 402 564 5867 FAX 402 563 9102 www mastercarebath com 20 Make sure the Casual Water Drain located in the back side of th...

Отзывы: