56
EN
Storage
The aluminium rail can be folded when the machine is unused. Unscrew the knob (50) until the taper
completely withdraw from the aluminium rail link (62) and at the same time draw the knob down until it cannot
move anymore. Then uprear the aluminium rail by the other hand to an angle until the knob (50) break away
form the rail link (62), you can release the knob now. When the aluminium rail rotates to a certain angle the
knob will automaticaly fit into the hole on the aluminium rail link (62, after that screw the knob (50) tight.
ATTENTION!
The saddle will slide down when folding the aluminium rail!
It is easy to hit your head when the rail is standing upright!
Содержание V- 550
Страница 1: ...1 CZ Veslovací trenažér MASTER V 550 UŽIVATELSKÝ MANUÁL ...
Страница 3: ...3 CZ 2 Obsah balení ...
Страница 14: ...14 CZ 6 Celkový nákres ...
Страница 17: ...17 SK Veslovací trenažér MASTER V 550 UŽIVATEĽSKÝ MANUÁL ...
Страница 19: ...19 SK 2 Obsah balenia ...
Страница 30: ...30 SK 6 Celkový nákres 7 ...
Страница 33: ...33 PL Wiosła treningowe MASTER V 550 INSTRUKCJA OBSŁUGI ...
Страница 35: ...35 PL 2 Zawartość opakowania ...
Страница 46: ...46 PL Kompletny układ ...
Страница 49: ...49 EN MAGNETIC ROWING MACHINE MASTER V 550 OWNER S MANUAL ...
Страница 51: ...51 EN 2 Assembly Pack Check List ...
Страница 52: ...52 EN 3 Assembly Step 1 Assemble the Front stabilizer 9 to Main frame 37 using Bolt 7 and Flat washer 8 ...
Страница 61: ...61 EN 6 Exploded view ...
Страница 64: ...64 DE Rudersimulator MASTER V 550 BENUTZERMANUAL ...
Страница 66: ...66 DE 2 Inhalt der Packung ...
Страница 77: ...77 DE 10 Entwurf ...
Страница 80: ...80 DE Bemerkungen Die Adresse Lokal Verteiler ...